Transmission Pricing

Transmission Pricing 2012

Transmission Pricing 2012

From April 2008, Transpower is required to use the Electricity Authority's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection, interconnection and HVDC charges for its customers.

A copy of the TPM can be found at http://www.ea.govt.nz/document/11336/download/act-code-regs/code-regs/the-code/part-12/ (Electricity Industry Participation Code 2010, Part 12 – Transport, Schedule 12.4). Each year Transpower determines the year specific information necessary to notify customers of their prices for the year commencing 1 April.

Download PDF (62kB) »

Transmission Pricing 2011

Transmission Pricing 2011

From April 2008, Transpower is required to use the Electricity Authority's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection, interconnection and HVDC charges for its customers.

A copy of the TPM can be found at http://www.ea.govt.nz/document/11336/download/act-code-regs/code-regs/the-code/part-12/ (Electricity Industry Participation Code 2010, Part 12 – Transport, Schedule 12.4). Each year Transpower determines the year specific information necessary to notify customers of their prices for the year commencing 1 April.

Download PDF (29kB) »

Transmission Pricing 2010

Transmission Pricing 2010

From April 2008, Transpower is required to use the Electricity Commission's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection, interconnection and HVDC charges for its customers.

A copy of the TPM can be found at http://www.electricitycommission.govt.nz/rulesandregs/rules (EGR Part F, Section IV including Schedule F5). Each year Transpower determines the year specific information necessary to notify customers of their prices for the year commencing 1 April.

Download PDF (17kB) »

Transmission Pricing 2009

Transmission Pricing 2009

From April 2008, Transpower is required to use the Electricity Commission's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection, interconnection and HVDC charges for its customers.

A copy of the TPM can be found at http://www.electricitycommission.govt.nz/rulesandregs/rules (EGR Part F, Section IV including Schedule F5). Each year Transpower determines the year specific information necessary to notify customers of their prices for the year commencing 1 April.

Download PDF (13kB) »

Transmission Pricing 2008

Transmission Pricing 2008

From April 2008, Transpower is required to use the Electricity Commission's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection, interconnection and HVDC charges for its customers.

A copy of the TPM can be found at http://www.electricitycommission.govt.nz/rulesandregs/rules (EGR Part F, Section IV including Schedule F5). Each year Transpower determines the year specific information necessary to notify customers of their prices for the year commencing 1 April.

Download PDF (82kB) »

Pricing for Grid Connection Services 2007

Pricing for Grid Connection Services 2007

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Under the regulatory regime that commenced on 1 March 2003 the Electricity Commission is overseeing a process to determine a new pricing methodology under which transmission charges will be calculated and enforced. In the meantime, Transpower is to continue to apply the pricing methodology provided for in the Electricity (Transpower’s Pricing Methodology) Regulations 2004. All customer charges not covered by fixed term contracts have been calculated in accordance with those Regulations.

Download PDF (55kB) »

Pricing for Grid Connection Services 2006

Pricing for Grid Connection Services 2006

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Under the regulatory regime that commenced on 1 March 2003 the Electricity Commission is overseeing a process to determine a new pricing methodology under which transmission charges will be calculated and enforced. In the meantime, Transpower is to continue to apply the pricing methodology provided for in the Electricity (Transpower’s Pricing Methodology) Regulations 2004. All customer charges not covered by fixed term contracts have been calculated in accordance with those Regulations.

Download PDF (80kB) »

Pricing for Grid Connection Services 2005

Pricing for Grid Connection Services 2005

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Under the regulatory regime that commenced on 1 March 2003 the Electricity Commission is overseeing a process to determine a new pricing methodology under which transmission charges will be calculated and enforced. In the meantime, Transpower is to continue to apply the pricing methodology provided for in the Electricity (Transpower’s Pricing Methodology) Regulations 2004. All customer charges not covered by fixed term contracts have been calculated in accordance with those Regulations.

Download PDF (36kB) »

Pricing for Grid Connection Services 2004

Pricing for Grid Connection Services 2004

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Under the regulatory regime that commenced on 1 March 2003 the Electricity Commission is overseeing a process to determine a new pricing methodology under which transmission charges will be calculated and enforced. In the meantime, Transpower is to continue to apply the pricing methodology provided for in the Electricity (Transpower’s Pricing Methodology) Regulations 2004. All customer charges not covered by fixed term contracts have been calculated in accordance with those Regulations.

Download PDF (17kB) »

Pricing for Grid Connection Services 2003

Pricing for Grid Connection Services 2003

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Download PDF (157kB) »

Pricing for Grid Connection Services 2002

Pricing for Grid Connection Services 2002

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Download PDF (182kB) »

Pricing for Grid Connection Services 2001

Pricing for Grid Connection Services 2001

Transpower’s pricing methodology allocates to its customers the company’s revenue requirement.

The revenue requirement includes the capital, maintenance, operating and overhead costs associated with owning and operating its assets.

Download PDF (328kB) »

Pricing for Grid Connection Services 2000

Pricing for Grid Connection Services 2000