Paraparaumu 220 kV Supply Connection resources

This page contains resources for the Paraparaumu 220 kV Supply Connection.

Notice of Requirement

On 16 May 2013, Transpower lodged its environmental application (known as a Notice of Requirement) for the project with the Kapiti Coast District Council.

Numbering Content

Main document

Assessment of Environmental Effects [ pdf 4.02 MB ]

Volume 1

 
Appendix A Certificates of Title [ pdf 4.63 MB ]
Appendix B Environmental Noise Assessment [ pdf 1.37 MB ]
Appendix C Ecological Assessment [ pdf 3.57 MB ]
Appendix D Contamination Assessment (Phase 2 Environmental Site Assessment) [ pdf 3.28 MB ]
Appendix E Landscape and Visual Assessment [ pdf 6.56 MB ]
Appendix F Indicative Erosion and Sediment Control Plan [ pdf 6.37 MB ]
Appendix G Statutory Plans Compliance Assessment [ pdf 319.28 KB ]
Appendix H Transpower Area of Study and Assessment Report (text only) [ pdf 2.72 MB ]
Appendix I Transpower Options Assessment Report [ pdf 4.01 MB ]

Volume 2

 
 Appendix J Schedule of Affected Properties and Land Requirement Plans [ pdf 53.6 KB ]
Appendix K Notice of Requirement Plans [ pdf 1.28 MB ]
Appendix L Overall Project Plans [ pdf 2.33 MB ]
Appendix M Substation Plans [ pdf 2.68 MB ]
Appendix N Transmission Line Plans [ pdf 6.61 MB ]
Appendix O Simulations [ pdf 13.37 MB ]
Appendix P Area of Study (Maps Only) [ pdf 12.62 MB ]