Publications and resources
Resources search
-
Energy use forecasting for heat pumps 2008
In 2008 BRANZ Ltd undertook a heat pump study report titled Active Cooling and Heat Pump Use in New Zealand.
- 05 November 2008
-
Peak Load and total energy use forecasting for heat pumps (QC5112) [ pdf 658.17 KB ]
-
Compliance Statement 2008
This Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Transpower Thresholds) Notice 2008 and the Deed of...
- 25 September 2008
-
Compliance Statement 2008 [ pdf 2.93 MB ]
-
DuPont Asset Management Review
This report is a comprehensive assessment and review of Transpower's maintenance practices and expenditures.
- 09 September 2008
-
Transmission Pricing 2008
From April 2008, Transpower is required to use the Electricity Authority's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection,...
- 01 April 2008
-
Transmission Pricing 2008 [ pdf 81.88 KB ]
-
Quality Performance Report 2007/08
This is Transpower New Zealand Limited’s annual Quality Performance Report. It sets out operational data that enables Transpower’s stakeholders to make an assessment of the...
- 01 January 2008
-
Quality Performance Report 2007/08 [ pdf 1.1 MB ]
-
Compliance Statement 2007
This public version of the Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Electricity Lines Thresholds)...
- 16 August 2007
-
Compliance Statement 2007 [ pdf 1.72 MB ]
-
Pricing for Grid Connection Services 2007
Transpower’s pricing methodology allocates to its customers the company’s revenue requirement. ...
- 01 April 2007
-
Pricing for Grid Connection Services 2007 [ pdf 54.5 KB ]
-
Optimised Deprival Valuation of Transpower 2006
The Optimised Deprival Valuation (ODV) provides the value of Transpower New Zealand Limited's (Transpower's) transmission grid (system fixed assets), using optimisation and deprival...
- 01 November 2006
-
Optimised Deprival Valuation 2006 [ pdf 2.85 MB ]
-
Compliance Statement 2006
This public version of the Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Electricity Lines Thresholds)...
- 18 August 2006
-
Compliance Statement 2006 [ pdf 4.62 MB ]
-
Pricing for Grid Connection Services 2006
Transpower’s pricing methodology allocates to its customers the company’s revenue requirement. ...
- 01 April 2006
-
Pricing for Grid Connection Services 2006 [ pdf 80.02 KB ]
Your current search:
- market-impact-assessment-changes-hvdc-cost-allocation���
Refine search:
Publication type
- Corporate publications (27) Apply Corporate publications filter
- Pricing publications (14) Apply Pricing publications filter
- Results and reports (7) Apply Results and reports filter
- Technical reports (4) Apply Technical reports filter
- Project factsheets (2) Apply Project factsheets filter
- Landowner resources (1) Apply Landowner resources filter