Publications and resources
Resources search
-
Annual Report 2008/09
This report describes Transpower’s financial and operational performance for the financial year ending 30 June 2009.
- 30 June 2009
-
Annual Report 2008/09 [ pdf 862.17 KB ]
-
Statement of Corporate Intent 2009/10
This statement sets out the Board’s overall intentions and objectives for Transpower New Zealand Limited and its subsidiary companies for the year commencing 1 July and the succeeding...
- 01 July 2009
-
Statement of Corporate Intent 2009/10 [ pdf 724.07 KB ]
-
Energy use forecasting for heat pumps 2009
Based on feedback Transpower received from the 2008 BRANZ Report, we commissioned a new study in 2009 with slightly adjusted assumptions and methodology. The report covers all regions in New...
- 13 July 2009
-
Regional heat pump energy loads (QC5118) - July 2009 [ pdf 1.15 MB ]
-
Trees and Transmission Lines
This brochure provides important information to landowners on managing vegetation (particularly trees) near overhead transmission lines.
- 01 August 2009
-
Trees and Overhead Transmission Lines [ pdf 297.72 KB ]
-
Asset Management Plan 2009
Transpower's Asset Management Plan (AMP) represents the intended asset management strategies and programmes of work for the National Grid infrastructure and related assets.
- 01 September 2009
-
Asset Management Plan 2009 [ pdf 540.11 KB ]
-
Compliance Statement 2009
This Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Transpower Thresholds) Notice 2008 and the Deed of...
- 28 September 2009
-
Threshold Compliance Statement 2009 [ pdf 5.86 MB ]
-
Information for Disclosure 2009
The Electricity (Information Disclosure) Regulations 1999 form part of the Government's regulatory regime for the electricity sector. The purpose and nature of these Regulations is...
- 27 November 2009
-
Information for Disclosure 2009 [ pdf 3.69 MB ]
-
Half Yearly Report 2009
This report describes Transpower's financial and operational performance for the six months to 31 December 2009.
- 31 December 2009
-
Half Yearly Report 2009 [ pdf 341.1 KB ]
-
Half Yearly Results 2009
Half year results for announcement to the market for the first six months of the financial year 2009/10.
- 31 December 2009
-
Half Yearly Results 2009 [ pdf 55.58 KB ]
-
Tilted Postage Stamp analysis – characterising the grid
This report describes the analysis undertaken by Transpower at the request of the Industry Transmission Pricing Project working group.
- 19 February 2010
-
Tilted Postage Stamp analysis – characterising the grid [ pdf 3.05 MB ]
Refine search:
Category
- (-) Remove Resources filter Resources
- (-) Remove Landowners filter Landowners
- (-) Remove Investors filter Investors
- Transmission assets (9) Apply Transmission assets filter
- Industry information (4) Apply Industry information filter
- Strategy and planning (4) Apply Strategy and planning filter
- Safety (3) Apply Safety filter
- Community (1) Apply Community filter
Publication type
- (-) Remove Corporate publications filter Corporate publications
- (-) Remove Landowner resources filter Landowner resources
- (-) Remove Corridor management resources filter Corridor management resources
- Results and reports (40) Apply Results and reports filter
- Safety resources (20) Apply Safety resources filter
- Pricing publications (14) Apply Pricing publications filter
- Project factsheets (8) Apply Project factsheets filter
- Technical reports (7) Apply Technical reports filter
- Electric and magnetic fields (EMF) (6) Apply Electric and magnetic fields (EMF) filter
- Presentations (2) Apply Presentations filter