Clutha and Upper Waitaki Lines Project Operational Information

Subscribe for updates

Subscribe to this page to receive email notifications when this page has been updated.

Enter your email address to subscribe to this page.

The system operator will use this webpage to publish updates or information related to the Clutha Upper Waitaki Lines Project (CUWLP).

Outage Information

Transpower, as grid owner, has notified outages of the following circuits for the project:

  • CYD_CML_TWZ_1 and 2 circuits for thermal upgrades POCP link 
  • NSY_ROX_1 and LIV_NSY_1 circuits POCP link 

​These outages can be viewed on POCP.  Any changes to these outages will be communicated via POCP and the usual notification processes.

Industry Briefings and Presentations

Recent Updates

5 November 2020

The system operator has published its decision on proposed temporary reduction to offload times during Clutha and Upper Waitaki Lines Project outages ( See CAN issued 5 Nov 2020 [  266.23 KB ])

16 October 2020

The system operator has completed the analysis of system frequency impacts for an islanding event during the CYD_CML_TWZ_1 and 2 circuit for thermal upgrades. A Permanent Manual Constraint has been published which will be used when a single contingency would lead to the separation of the Southland from the remainder of the grid. Refer to the CAN for more details

CAN New Permanent Manual Constraint for GZ14 Export [  256.59 KB ]

02 October 2020

The grid owner has changed the schedule for outages on CYD_CML_TWZ_1 and CYD_CML_TWZ_2 over the period 16 November to 11 December 2020.

  • The 16 to 20 and 23 to 27 November outages on CYD_CML_TWZ_2 will now run continuously from 16 to 27 November.
  • The 30 November to 04 December and 7 December to 11 December on CYD_CML_TWZ_1 will now run continuously from 30 November to 11 December.

The weekend outages allow for additional substation work and safer working.  If we are able to return the assets to service earlier, we will notify here and via POCP.

Project Progress

 

Customer Advice Notices (CANs)

Date Title
23/11/2020 CAN Temporary reduction to offload times during Clutha and Upper Waitaki Lines Project outages (Refer CAN Ref: 3700368592 05 November 2020 and CAN Ref: 3685077424 23 October 2020) [  253.76 KB ]
05/11/2020 CAN Decision on proposed temporary reduction to offload times during Clutha and Upper Waitaki Lines Project outages (Refer CAN 23 October 2020) [  266.23 KB ]
23/10/2020 CAN Feedback invited on proposed temporary reduction to offload times during Clutha and Upper Waitaki Lines Project outages [  192.55 KB ]
16/10/2020 CAN New Permanent Manual Constraint for GZ14 Export [  256.59 KB ]
15/09/2020 CAN Update on outages for Clutha and Upper Waitaki [ pdf 189.73 KB ]
09/09/2020 CAN Industry Briefing on Clutha Upper Waitaki Lines Project [ pdf 271.76 KB ]
28/08/2020 CAN Power Flow Limits - Clutha Upper Waitaki Lines Project (CUWLP) [ pdf 177.68 KB ]
18/08/2020 CAN Asset Capability - Clutha Upper Waitaki Lines Project (CUWLP) [  264.1 KB ]
12/08/2020 CAN Clutha Upper Waitaki Lines Project (CUWLP) Outages [  360.77 KB ]
06/08/2020 CAN Clutha Upper Waitaki Lines Project (CUWLP) Timing Update [  258.65 KB ]
28/07/2020 CAN Outages for Clutha and Upper Waitaki Lines Project enabling works [  177.09 KB ]
23/07/2020 CAN Clutha Upper Waitaki Lines Project Timing Under Review [  178.73 KB ]

10 min Offload Times

The system operator has considered the feedback and made a decision on proposed temporary reduction to offload times during Clutha and Upper Waitaki Lines Project outages (Refer CAN [  266.23 KB ]: 5 November 2020)

Analysis

The system operator has completed analysis of the power flow limits during the Clutha Upper Waitaki Lines Project (CUWLP). This identifies the approximate transfer limits and indicative constraints that will apply during the various stages of the Project. The system operator will advise what the transfer limits and indicative generation constraints will be at the completion of the duplexing in due course. Power Flow Limits - Clutha Upper Waitaki Lines Project (CUWLP) [ pdf 189.52 KB ] link.

Questions and Answers

A set of questions we have received from industry along with our responses is available on our CUWLP Q & A page.


Links to Additional Information

Clutha Upper Waitaki Lines Project page

NZGB website

POCP database

Videos that explain how to perform POCP searches and receive notifications of outage changes are available on our Transpower YouTube channel, under the playlist Planned Outage Co-ordination Process