Resources
Displaying 151 - 160 of 172
Last updated: 01 Oct 2021
Transmission Planning Report 2021.pdf
… Transmission Planning Report 2021 Chapter 1: Introduction 2021 Transmission Planning Report © … across New Zealand. Transmission Tomorrow is informed by Whakamana i Te Mauri Hiko – Empowering our Energy Future 3 … Transmission Planning Report 2021.pdf …
Last updated: 03 Sep 2021
Transmission Planning Report 2021.pdf
… Transmission Planning Report 2021 Chapter 1: Introduction 2021 Transmission Planning Report © … across New Zealand. Transmission Tomorrow is informed by Whakamana i Te Mauri Hiko – Empowering our Energy Future 3 … Transmission Planning Report 2021.pdf …
Last updated: 22 Oct 2020
ALL TCC Feedback received.pdf
… 21 October 2020 Transpower Ltd PO Box 1021 Wellington 6140. By email to [email protected] Re: Feedback … provide feedback on the TCC workshop on 6 October that I attended on behalf of ENA members. Overall, the workshop would … require significant investment as identified Transpower’s Whakamana i Te Mauri Hiko Report 4 and other recent studies …
Last updated: 27 Sep 2022
2022 Asset Management Plan.pdf
… Asset Management Plan 2022 Managing and maintaining our grid, ICT and Business Support assets September 2022 Asset Management Plan 2022 Transpower New … and lower carbon sources of generation. Our purpose, Whakamana i te mauri hiko tu mai Aotearoa – empowering the …
Last updated: 06 Nov 2024
Presentation - 2024 System Operator Asset Owner Engineering Forum.pdf
… POWERING NEW ZEALAND TODAY + TOMORROW ASSET OWNER ENGINEERING FORUM 2024 1 2 Whakamana i te mauri hiko tū mai Aotearoa. Empowering the energy future … Presentation - 2024 System Operator Asset Owner Engineering Forum.pdf …
Last updated: 28 Sep 2026
Transmission Planning Report 2026
… Transmission Planning Report 2026 Table of contents 2026 Transmission Planning Report © Transpower New … context Transpower’s view of the future, as outlined in Whakamana i Te Mauri Hiko – Empowering the energy future for … Transmission Planning Report 2026 …
Last updated: 21 Nov 2023
Service Measures Report 2023.pdf
… Service Measures Report 2023 November 2023 Service Measures Report 2023 Transpower New Zealand Limited 1 Contents Introduction 4 1.1. Purpose of service … as outlined in our analysis of electrification pathways Whakamana i Te Mauri Hiko.17 For our revenue linked grid …
Last updated: 21 Nov 2023
Asset Management Plan 2023.pdf
… ex Asset Management Plan 2023 Managing and maintaining our grid, ICT, and business support … 2023 Asset Management Plan 2023 Transpower New Zealand Limited 1 Contents Introduction… … and lower carbon sources of generation. Our purpose, Whakamana i te mauri hiko tu mai Aotearoa – empowering the …
Last updated: 05 Dec 2022
Net Zero Grid Pathways 1 major capex proposal.pdf
… TRANSPOWER NEW ZEALAND | NET ZERO GRID PATHWAYS 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 1 … 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 2 Contents 1.0 Executive Summary … emissions by 2050. Industry forecasts, including our own Whakamana i Te Mauri Hiko (WiTMH), point toward a 60- 80 per …
Last updated: 23 Sep 2021
SO Annual Review 2020-21.pdf
… System Operator Annual Self-Review and Assessment 2020-2021 … need to deliver the electrified future described in our Whakamana i te Mauri Hiko report. ▪ Working with the … SO Annual Review 2020-21.pdf …