Publications and resources
Resources search
-
Horticulture work around transmission lines
A factsheet on the hazards of trees and vegetation around transmission lines with reference to the horticulture industry
- 04 November 2013
-
Horticulture work around transmission lines [ pdf 485.09 KB ]
-
Hazards From Trees Notice
General information notice in relation to the Electricity (Hazards from Trees) Regulations 2003.
- 28 June 2013
-
Hazard from Trees Notice [ pdf 39.61 KB ]
-
Underground cable safety guidelines
This brochure is a guide to safe working practices when working near our underground electricity and associated communication networks.
- 20 May 2013
-
Underground cable safety guidelines [ pdf 1.06 MB ]
-
Tower Foundation Replacement
Tower foundation replacement involves replacing the steel at and below the level of the ground, to ensure they continue to maintain the structural integrity of the tower.
- 21 March 2013
-
Tower Foundation Replacement [ pdf 407.02 KB ]
-
New Zealand Electrical Code of Practice for Electrical Safe Distances (NZECP 34)
The Electrical Code of Practice sets minimum safe electrical distance requirements for overhead electric line installations/other works associated with the supply of electricity to consumers....
- 25 January 2013
-
New Zealand Electrical Code of Practice for Electrical Safe Distances [ pdf 874.96 KB ]
-
Transmission Pole Replacement
Over time, transmission poles may require replacement due to normal age-related wear and tear or to ensure safe ground clearances are maintained.
- 15 August 2012
-
Transmission Pole Replacement [ pdf 232.28 KB ]
-
Transmission Line Helicopter Operations
Helicopters are a vital part of inspecting and maintaining our 11,800 km of transmission lines throughout the country.
- 15 August 2012
-
Transmission Line Helicopter Operations [ pdf 517.04 KB ]
-
Transmission Line Condition Assessments and Patrols
We routinely check and assess the condition of that equipment to ensure the National Grid continues to provide a safe and secure power supply for the country.
- 15 August 2012
-
Transmission Line Condition Assessments and Patrols Work Overview [ pdf 311.68 KB ]
-
Tower Painting
Tower painting is part of our routine maintenance activities to ensure they continue to provide a reliable service over their expected lifetimes.
- 15 August 2012
-
Tower Painting Work Overview [ pdf 646.28 KB ]
-
Tower Foundation Refurbishment
Tower foundation refurbishment involves reinforcing transmission tower foundations, to ensure they continue to accommodate the existing and future loadings expected in their lifetimes.
- 15 August 2012
-
Tower Foundation Refurbishment [ pdf 556.61 KB ]
Refine search:
Publication type
- (-) Remove Landowner resources filter Landowner resources
- (-) Remove Safety resources filter Safety resources
- (-) Remove Corridor management resources filter Corridor management resources
- Corporate publications (2) Apply Corporate publications filter