Search
Displaying 21 - 25 of 25
Last updated: 18 Feb 2025
TKU Circuit Overload Protection Scheme - Overview (v1.0)
This document provides information on the operation and procedures related to the Tokaanu (TKU) Circuit Overload Protection Scheme.
Last updated: 18 Feb 2025
20250218 TIM Supply Transformer Overload Protection Scheme - Overview (v1.0)
This document provides information on the operation and procedures related to the Timaru (TIM) Supply Transformer Overload Protection Scheme Overview (transformers: T3, T4, & T6). Has also been referred to as the TIM T3 T4 T6 STOPS Scheme.
Last updated: 18 Feb 2025
OAM-WTK Circuit Overload Protection Schemes - Overview (v1.0)
This document provides information on the operation and procedures related to the Oamaru 110 kV circuit overload protection scheme. This scheme combines two previously separate schemes: Bells Pond-Waitaki Overload Protection Scheme & Black Point-Waitaki Overload Protection Scheme.
Last updated: 18 Feb 2025
AVI-BEN Circuit Overload Protection Scheme - Overview (v1.0)
This document provides information on the operation and procedures related to the AVI-BEN Circuit Overload Protection Scheme (AVI-BEN COPS).
Last updated: 28 Nov 2024
Interconnection Asset Capacity and Grid Configuration 2023 – 2024
Interconnection asset report. Capacity and grid configuration, and availability and reliability. Our latest report pursuant to the EIPC 12.118, and the availability and reliability report (12.127).