Submissions have now closed
Background information
New Zealand’s electricity system is becoming more distributed, dynamic and data-dependent. Growth in distribution-connected generation, batteries, controllable demand, electric vehicle charging and large new loads means activity on local networks can increasingly affect demand forecasts, power flows, system security, emergency management and restoration. At the same time, transmission conditions and wholesale market outcomes can influence how distribution networks are operated.
This discussion paper proposes five foundational, no-regret operational requirements to support effective coordination between the System Operator and distribution-level operations: clear operational accountabilities, minimum static information, minimum dynamic information, interoperable information exchange, and predictable technical performance. These requirements are intended to support existing operational responsibilities under a range of possible future TSO–DSO models, while allowing arrangements to develop proportionately as operational needs emerge.
The paper seeks industry feedback on whether the proposed requirements are complete, practical and proportionate, and which information exchanges or use cases should be defined or tested first.
Consultation Documents
Submissions
We received 11 submissions listed below.
| Cortexo | View |
| Counties Energy | View |
| Electricity Networks Aotearoa | View |
| Haast Energy | View |
| Independent Electricity Generators Association | View |
| Orion | View |
| Powerco | View |
| Top Energy | View |
| Unison and Centralines | View |
| Vector | View |
| WEL Networks | View |