Last updated: 26 Nov 2026
What are we doing?
Transpower is investigating the next phase of possible major investments in the lower South Island’s electricity transmission grid as it plans for continued growth, electrification and the connection of more renewable generation. The area Transpower is considering in this investigation spans Bluff to Twizel and includes the cities of Dunedin and Invercargill, alongside important tourism and rural service centres such as Queenstown, Wānaka and Cromwell. The region is also home to New Zealand’s largest electricity consumer, New Zealand Aluminium Smelter at Tiwai Point.
A consultation on a longlist of possible investment options is open from 26 November 2026 to 5 February 2027.
Why are we doing it?
This investigation follows significant work in recent years to boost transmission capacity into and out of the wider region as well as projects to connect new renewable generation and major new electricity loads. Transpower is closely monitoring developments in the lower South Island. While electricity demand growth has been relatively slow in the last ten to 15 years across New Zealand, we are now starting to see planned generation and increased demand for electricity ramp up, particularly in the lower South Island. We are focused on getting the timing and pace of investment right to both enable growth and take a balanced approach to costs.
Increased demand for electricity includes planned expansion of production at Tiwai Point, Datagrid’s proposed data centre, new plans for increased food and fertiliser production, and companies like Fonterra moving from fossil fuels to electricity. Alongside new demand for electricity is significant investment in renewable generation with more than 2,500 MW of solar, wind and batteries currently being investigated or delivered in the lower South Island.
What's happening?
A consultation on a longlist of possible investment options will run from 26 November 2026 to 5 February 2027. More information and the full longlist consultation documents can be found here.
A webinar on the longlist consultation will be held on Friday 4 December at 11.30am. To register, click here.
Feedback can be emailed to [email protected] by Friday 5 February 2027.
Timeline and updates
- 2022 - Clutha Upper Waitaki Lines Upgrade completed
- 2023 onwards - engagement with customers and stakeholders in the region to monitor future transmission needs
- 2026 - longlist consultation published
- 2028 - shortlist consultation planned
- Late 2020s - planned development of a Major Capex Proposal for Commerce Commission consideration
- 2030s - indicative start of possible major transmission infrastructure construction.