Publications and resources
Resources search
-
Transmission Pricing 2009
From April 2008, Transpower is required to use the Electricity Authority's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection,...
- 01 April 2009
-
Transmission Pricing 2009 [ pdf 12.81 KB ]
-
Guide to Electrical Safety for Emergency Personnel
Guidance on avoiding electrical hazards in incidents that involve any electricity network or other installations.
- 01 April 2009
-
Guide to Electrical Safety for Emergency Personnel [ pdf 2.58 MB ]
-
Quality Performance Report 2008/09
This is Transpower New Zealand Limited’s annual Quality Performance Report. It sets out operational data that enables Transpower’s stakeholders to make an assessment of the...
- 01 January 2009
-
Quality Performance Report 2008/09 [ pdf 826.88 KB ]
-
Asset Management Plan 2008
Transpower’s Asset Management Plan represents the intended asset management strategies and programmes of work for the National Grid infrastructure and related assets.
- 01 December 2008
-
Asset Management Plan 2008 [ pdf 499.18 KB ]
-
Information for Disclosure 2008
The Electricity (Information Disclosure) Regulations 1999 form part of the Government's regulatory regime for the electricity sector. The purpose and nature of these Regulations is...
- 28 November 2008
-
Information for Disclosure 2008 [ pdf 6.79 MB ]
-
LECG Review of Grid Investment Approval Procedures
LECG has reviewed the current grid investment approval procedures and identified some key deficiencies in the regulatory framework for transmission investment.
- 19 November 2008
- View more resources
-
Energy use forecasting for heat pumps 2008
In 2008 BRANZ Ltd undertook a heat pump study report titled Active Cooling and Heat Pump Use in New Zealand.
- 05 November 2008
-
Peak Load and total energy use forecasting for heat pumps (QC5112) [ pdf 658.17 KB ]
-
Compliance Statement 2008
This Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Transpower Thresholds) Notice 2008 and the Deed of...
- 25 September 2008
-
Compliance Statement 2008 [ pdf 2.93 MB ]
-
DuPont Asset Management Review
This report is a comprehensive assessment and review of Transpower's maintenance practices and expenditures.
- 09 September 2008
-
Statement of Corporate Intent 2008/09
This statement sets out the Board’s overall intentions and objectives for Transpower New Zealand Limited and its subsidiary companies for the year commencing 1 July and the succeeding...
- 01 July 2008
-
Statement of Corporate Intent 2008/09 [ pdf 174.97 KB ]
Refine search:
Category
- Resources (139) Apply Resources filter
- Transmission assets (12) Apply Transmission assets filter
- Landowners (11) Apply Landowners filter
- Industry information (7) Apply Industry information filter
- Strategy and planning (7) Apply Strategy and planning filter
- Investors (3) Apply Investors filter
- Safety (3) Apply Safety filter
- Environment (1) Apply Environment filter
Publication type
- Corporate publications (98) Apply Corporate publications filter
- Results and reports (44) Apply Results and reports filter
- Landowner resources (32) Apply Landowner resources filter
- Safety resources (19) Apply Safety resources filter
- Pricing publications (14) Apply Pricing publications filter
- Project factsheets (8) Apply Project factsheets filter
- Technical reports (8) Apply Technical reports filter
- Electric and magnetic fields (EMF) (6) Apply Electric and magnetic fields (EMF) filter
- Corridor management resources (2) Apply Corridor management resources filter
- Presentations (2) Apply Presentations filter