Transpower Integrated Report FY24 final
… Integrated Report FY 2024 Optimising the transition D. 17 2024 1994 … over 100 years, our people have been the kaitiaki of the transmission lines and substations that form the National … for New Zealand OUR PURPOSE Transpower is responsible for planning, building, maintaining and operating the National …
Last updated: 30 Jun 2025
Transpower 2025 26 SCI Final
… 9 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost-efficient transmission grid that meets New Zealand’s needs now and … (typically an AHI of eight or higher). We measure and report the AHI for seven key asset classes5 for the RCP4 … previous two years is achieved. In FY26, this measure is reporting only, while the RCP4 asset health quality standard …