Resources
Displaying 21 - 30 of 44
Last updated: 04 Aug 2025
TP_Sub_Reg_Roadmap_BESS_31July2025
… the Authority already has underway or was already planning to undertake. The most notable omission is several … providing IR can be greater than connection capacity during transmission outages. Because IR is procured at the island … the Code nor market system cater for the consideration of transmission capacity in the IR scheduling process. Manual …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; major … evidence that supports the rationales such as contracts, reports, memos, financial or other data, results of … investment is consistent with our latest Transmission Planning Report (2023), which is part of the suite of …
Last updated: 20 Aug 2025
USI MCP - Attachment 4 - Application of the Investment Test
… and modelled projects; and • cost of losses, including transmission and local losses. The benefits and the … Transpower’s investment options using either concept design reports or internal cost data, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
Last updated: 05 Aug 2025
Transpower NPS Renewable Energy Generation Submisision
… a more enabling regulatory framework for electricity transmission, which is crucial for New Zealand's … 1021 Wellington 6140 Attention: Daniel Hamilton, Strategic Planning Lead Email: [email protected] Phone: … co.nz/public/bulk-upload/documents/2025%20SOSA%20-%20Final%20Report.pdf?VersionId=tOo4Y8.kp2mloi9EOkUEDxkLDLv7Dxjt 4 July …
Last updated: 18 Sep 2025
TP_Sub_Draft_Geothermal_Strategy_12Sept2025
… on the concept of anticipatory investment for electricity transmission infrastructure, through our Te Kanapu “future … proposal to explore how zoning provisions and new spatial planning provisions can facilitate increased investment and … focused on managing material environmental effects Final Report (Resource Management (Consenting and Other System …
Last updated: 11 Feb 2025
TP_Sub_Resource_Management_Consenting and other_Amendments_Bill_10Feb2025
… to meet its emissions reduction targets; • Simplifying the planning system. 3 However, we are concerned that the … changes, is a step in the right direction to enabling the transmission activities that are needed to enable … (see also paragraphs 61-62 of the Supplementary Analysis Report). In this regard, section 171 has been amended to …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 7 - Investment Test
… and Generation Scenarios Attachment 3 – Cable Condition Report Attachment 4 – Short-list of Investment Options … • capital costs of the investment options and modelled transmission projects, • operating and maintenance costs of … manufacture, testing, vessel mobilisation, and consent planning. These assumptions are a key reason for seeking …
Last updated: 09 May 2024
Promoting competition in the wholesale electricity market in the transition toward 100% renewable electricity - submission to Electricity Authority (Dec 2022)
… pages v and vi. 5 Whakamana I Te Mauri Hiko monitoring report September 2022. 6 Concept Consulting July 2022 … refreshed our Envision tool8 (our geospatial interface to transmission network information) to help parties understand the opportunities and constraints on the transmission network; and • our new Connections Management …
Last updated: 20 Aug 2025
USI MCP - Attachment 7 - Stakeholder consultation
… of other stakeholder engagement activities – including non- transmission solutions – is summarised throughout the … on long list of options September 2023 Transmission Planning Report 2023 February 2024 Request for Proposals for …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 4 - Short list of investment options
… and Generation Scenarios Attachment 3 – Cable Condition Report Attachment 4 – Short-list of Investment Options … 11 2.3 Non-transmission solutions … of options, which fell into three broad categories: 1. Non-transmission options • Alternatives aimed at decreasing or … Cook Strait Delivery timeline: 48-55 months delivery after planning investigations (i.e., procurement and design …