Resources
Displaying 31 - 40 of 44
Last updated: 07 Aug 2025
Submission Te Waihanga Draft NIP- August 2025
… and avoid being a barrier to, electrification • Spatial planning provides an opportunity for Transpower, but it must … regulatory framework for planning and consenting of transmission infrastructure • A cohesive and enduring … and Conservation Authority 2024, Electric Homes Technical Report …
Last updated: 17 Mar 2025
TP_Sub_ Modernising conservation land management_redacted_Mar2025
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
Last updated: 20 Aug 2025
USI MCP Overview Document
… 2.3 Transmission capacity and constraints … are uncertainties. We have used a prudent forecast in our planning to ensure we have time to invest without putting … pricing impacts; o Attachment 10 – Power Systems Analysis Report; and o Attachment 11 – CEO Certification. 8 Next …
Last updated: 28 Feb 2025
TP_Sub_ Modernising conservation land management redacted
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
Last updated: 09 Sep 2025
HVDC MCP Main overview document
… and generation scenarios o Attachment 3 – Cable Condition Report o Attachment 4 – Short-list of investment options o … o Attachment 8 – Stakeholder engagement o Attachment 9 – Transmission Pricing Methodology and Indicative Pricing … 2024) 14: This consultation discussed the need to begin planning for the replacement of the submarine cables. …
Last updated: 04 Oct 2023
Proposed amendments to the National Code of Practice (Utility operators’ access to transport corridors)
… of the National Grid, with 11,000 km of high voltage transmission lines, and 37,000 towers and poles, connecting … 2022, Page 5 5 Draft Utility Location Standard: Decision Report following consultation on draft standard, 1 June …
Last updated: 23 May 2025
20250520 Final submission NEMA Discussion Doc
… Document). It is difficult to overstate the importance of planning for events, for communities, lifeline utilities and … risk reduction through modern designs that ensured the transmission service was not interrupted even when the … or direction. In our view, common event situation reporting templates for use by critical infrastructure …
Last updated: 20 Aug 2025
USI MCP - Attachment 5 - Costing
… and include expenses related to consenting and designation. Transmission lines construction works This includes material … with input from protection and automation SMEs and system planning. Total 77.2 164.0 165.5 4 Cost estimate of … • Technical reviews. • Performance monitoring and reporting. Transpower will allocate experienced management …
Last updated: 26 Feb 2025
Submission on Local Government water Services Bill
… maintains, and owns and operates New Zealand’s high voltage transmission network (National Grid). Transpower’s primary focus is the provision of transmission infrastructure to support New Zealand’s … supply, create water safety plans and carry out testing and reporting for the taking of Council drinking water. This …
Last updated: 05 Aug 2025
Transpower NES Electricity Network Activities Submission
… a more enabling regulatory framework for electricity transmission, which is crucial for New Zealand's … 1021 Wellington 6140 Attention: Daniel Hamilton, Strategic Planning Lead Email: [email protected] Phone: … i Te Mauri Hiko (2020) and Te Kanapu (2025). These reports demonstrate the scale of new renewable generation …