Resources
Displaying 21 - 27 of 27
Last updated: 20 Dec 2024
WBoP - Attachment 6 - Costing
… of the proposal and is a supporting attachment to our main report (‘Western Bay of Plenty Development Plan Major Capex … is for the near- term work required on the interconnected transmission grid only. 1 Approach to estimating capex We … project delivery procedures including governance oversight, planning, TRANSPOWER NEW ZEALAND | WESTERN BAY OF PLENTY …
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience Attachment 4 - Costing
… and include expenses related to consenting and designation. Transmission lines construction works This includes material … replacements and costs are as advised by Transpower Asset Planning Management and can be considered as Class 4. 1 … • Technical reviews. • Performance monitoring and reporting. Transpower will allocate experienced management …
Last updated: 18 Jul 2025
USI Short-list - July 2025 - Summary of submissions
… option but raise concerns regarding the application of the Transmission Pricing Methodology (TPM) on this project. … need date. 5c Uncertainty of electrification caused by RETA reports. We recognise the uncommitted nature of the projects … are reasonable and appropriate for infrastructure planning. 5e Tiwai demand response contract. Following …
Last updated: 07 Mar 2025
USI Short-list - Summary of submissions
… under increased capital costs. Additional points raised 1. Transmission charges: Westpower expressed concerns about the … summer months, requiring careful consideration in upgrade planning. • Evolving load control strategies: The shift from … if and when required. 3.1 Other points raised 1. Westpower reported significant recent increases in transmission …
Last updated: 15 Jan 2026
WUNI2 - Attachment 4 - Benefits modelling
… 1.3 Generation Expansion Planning … 2.1 Transmission Network … to calculate the benefits of investment options to provide transmission into the WUNI region. The main components of … case results are labeled as Option 0 in the charts in this report. TRANSPOWER NEW ZEALAND | WUNI STAGE 2 PROJECT: MAJOR …
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience Attachment 5 - Application of the Investment Test
… 8 Undiscounted capital costs in both Transpower’s transmission grid and (for Option 3) Unison’s distribution … demand Demand varies by scenario and net benefit is reported for each of the four scenarios. Size, timing, … of $10,000 per MWh, $20,000 per MWh and $50,000 per MWh are reported. Scenario weightings An equally weighted scenario …
Last updated: 15 May 2025
USI NTS RFP Stage 1
… Request for Proposal Upper South Island Non-transmission solutions RFP No: SUP-16702 RFP release date: … constraints arising for the region under our prudent planning forecast. Table 1 – Annual Forecast Capacity … b. Transpower reserves the right, at its discretion, to report suspected collusive or anti- competitive conduct by …