Resources
Displaying 1 - 10 of 19
Last updated: 11 Nov 2025
TPM PIR - summary report
… TPM Post Implementation Review, summary report - public October 2025 concept About Concept … is conducting a post implementation review (PIR) of the new transmission pricing methodology (TPM). Its purpose is to … • The quality of engagement in transmission investment planning has deteriorated and is increasingly simplistic and …
Last updated: 25 Oct 2022
New Connections General FAQ
… connections funded? Funding of connections is split between Transmission Pricing Methodology (TMPM) charges and … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
Last updated: 03 Mar 2023
Application Form Guidance Notes
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … be made by the party proposing to connect to Transpower’s transmission network: this will either be the developer of a … a generation project. The applicant will need to submit a report detailing the conceptual design of generation and the …
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… 8 WORKSTREAM A: TRANSMISSION CONNECTION AND CHARGES … 20 Phase B3. Planning … Electricity Industry Participation Code 20101 FTR Financial Transmission Rights GIP Grid Injection Point Grid The system … Control And Data Acquisition system SSR Solution Study Report SOW Statement Of Work System Operator Transpower …
Last updated: 26 Feb 2025
February customer webinar slides 2025
… Manager, Grid Delivery 13:45 – 14:00 New disclosure reporting obligations required of Transpower by the … others) • Enabled early start of some activities such as transmission lines environmental assessments • Added … as well as the cost of generation developments on the transmission and distribution networks.” …
Last updated: 10 Dec 2025
Customer and stakeholder webinar December 2025
… either the ground or long metal connection like our transmission lines. Why a transmission issue not … answer questions in March 2026. • We will utilise standard reporting and management procedures and documentation like … schedule and resourcing • Interaction with ‘Area grid planning’ • Potential for some projects to then go straight …
Last updated: 29 Jul 2025
Northland-Doc-Dec 24
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 21 Jan 2025
Resilience Reliability and an Energy Bridge Te Tai Tokerau Northland
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 21 Aug 2025
August Customer Webinar slides
… leases and line of business allocation (SOSPA split). Transmission Line of Business We have a growing workplan 200 … 2025 – 31 months • 9 main Contractors – Environmental & Planning Specialist, 3 ECs, 5 SP. • Engagement of more than … • The dedicated Customer Team, as well as having a customer reporting framework, has made a positive difference. Tim …
Last updated: 03 Mar 2023
Connection Application Form
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … Conceptual design Has the applicant included a report of preliminary design of the project, including … the applicant included a report considering connection and transmission capacity for the proposed connection (for …