Resources
Displaying 1 - 10 of 13
Last updated: 25 Oct 2022
New Connections General FAQ
… connections funded? Funding of connections is split between Transmission Pricing Methodology (TMPM) charges and … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
Last updated: 03 Mar 2023
Application Form Guidance Notes
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … be made by the party proposing to connect to Transpower’s transmission network: this will either be the developer of a … a generation project. The applicant will need to submit a report detailing the conceptual design of generation and the …
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… 8 WORKSTREAM A: TRANSMISSION CONNECTION AND CHARGES … 20 Phase B3. Planning … Electricity Industry Participation Code 20101 FTR Financial Transmission Rights GIP Grid Injection Point Grid The system … Control And Data Acquisition system SSR Solution Study Report SOW Statement Of Work System Operator Transpower …
Last updated: 26 Feb 2025
February customer webinar slides 2025
… Manager, Grid Delivery 13:45 – 14:00 New disclosure reporting obligations required of Transpower by the … others) • Enabled early start of some activities such as transmission lines environmental assessments • Added … as well as the cost of generation developments on the transmission and distribution networks.” …
Last updated: 29 Jul 2025
Northland-Doc-Dec 24
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 21 Jan 2025
Resilience Reliability and an Energy Bridge Te Tai Tokerau Northland
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 03 Mar 2023
Connection Application Form
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … Conceptual design Has the applicant included a report of preliminary design of the project, including … the applicant included a report considering connection and transmission capacity for the proposed connection (for …
Last updated: 07 Aug 2025
Guidance for developers establishing Wind Farms near Transpower Assets R2 FINAL
… provided in the National Policy Statement on Electricity Transmission 2008 (NPSET); - Comply with the mandatory safe … their own cost. Any EPR mitigation recommended in the final report should be considered in the design and construction … National Grid, please contact our Environmental Policy and Planning group at transmission[email protected]. If …
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 25 Jul 2025
Building the renewable generation we need to deliver New Zealands energy future - a discussion document for consenting authorities
… is the owner and operator of the national electricity transmission grid that carries electricity from where it is … including about development of new generation and transmission infrastructure. When a generation company or … co.nz/public/bulk-upload/documents/2025%20SOSA%20-%20Final%20Report.pdf?VersionId=tOo4Y8.kp2mloi9EOkUEDxkLDLv7Dxjt …