Resilience Reliability and an Energy Bridge Te Tai Tokerau Northland
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 21 Aug 2025
August Customer Webinar slides
… leases and line of business allocation (SOSPA split). Transmission Line of Business We have a growing workplan 200 … 2025 – 31 months • 9 main Contractors – Environmental & Planning Specialist, 3 ECs, 5 SP. • Engagement of more than … • The dedicated Customer Team, as well as having a customer reporting framework, has made a positive difference. Tim …
Last updated: 03 Mar 2023
Connection Application Form
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … Conceptual design Has the applicant included a report of preliminary design of the project, including … the applicant included a report considering connection and transmission capacity for the proposed connection (for …
Last updated: 23 Feb 2026
TPM Consultation - CNI starting BBI customer allocations - Draft Record - Feb 2026
… proposed starting BBI customer allocations under the transmission pricing methodology (TPM).1 The CNI BBI is one … MCP ATTACHMENT D - SCENARIO & MODELLING REPORT.pdf?VersionId=wt97ozdmYWIpNhdB4HSzMxrQR_KFRCfS. The … Growth, and Reference scenarios. • Generation expansion planning. We find a combination of new generation projects …
Last updated: 07 Aug 2025
Guidance for developers establishing Wind Farms near Transpower Assets R2 FINAL
… provided in the National Policy Statement on Electricity Transmission 2008 (NPSET); - Comply with the mandatory safe … their own cost. Any EPR mitigation recommended in the final report should be considered in the design and construction … National Grid, please contact our Environmental Policy and Planning group at transmission[email protected]. If …
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 27 Mar 2026
MEUG - TPM Operational Review Workstream 1 submission
… commencing this operational review of the current Transmission Pricing Methodology (TPM) and the establishment … businesses across the country continue to face increases in transmission charges, yet with less transparency and … that the Concept Consulting post-implementation review report2 succinctly captures the concerns raised by a broad …
Last updated: 25 Jul 2025
Building the renewable generation we need to deliver New Zealands energy future - a discussion document for consenting authorities
… is the owner and operator of the national electricity transmission grid that carries electricity from where it is … including about development of new generation and transmission infrastructure. When a generation company or … co.nz/public/bulk-upload/documents/2025%20SOSA%20-%20Final%20Report.pdf?VersionId=tOo4Y8.kp2mloi9EOkUEDxkLDLv7Dxjt …
Last updated: 16 Oct 2025
October 2025 Customer Webinar Slides
… e karakia Tim Duguid & Avi Dastidar 14:30 Integrating non-transmission solutions into our Major Capital Projects … Investment Group Manager Major Capital Projects update Non-transmission solutions – what are they? Our new approach … brownfield Larger, greenfield Introducing new harmonic reporting Identifying further opportunities to increase …
Last updated: 12 Dec 2025
TPMReview_ToR_FINAL
… Terms of reference for Transmission Pricing Methodology working group Introduction … 1. Transpower has initiated an ‘operational review’ of the Transmission Pricing Methodology (TPM) to address concerns … of the PIR are set out in Concept Consulting’s summary report. 9. In November 2025, after completing the PIR, …