IWG meeting 1_02022026 agenda and briefing paper
… meeting Question / request Response 1. Request for full PIR report to be provided to IWG Suggest relevant aspects are … review of the TPM, and develop change proposals to the transmission pricing methodology that are consistent with — … the Authority, such as the ‘beneficiary pays’ principles of transmission pricing. • Transpower and the IWG will explore …
Last updated: 03 Nov 2022
Connection Management Framework Decision Paper
… wishing to connect new generation and energy storage to the transmission network. 10. The Framework applies to all … information on grid constraints via the Transmission Planning Report, Envision tool, workshops, and Concept Assessments. …
Last updated: 17 Mar 2026
Operational review - TPM workstream 1 housekeeping changes
… Schedule 12.4 85 15 December 2025 cl 12.93 Schedule 12.4 Transmission Pricing Methodology Schedule 12.4: replaced, on … 4 of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology) 2022. Part A Preliminary 1 … verification means, for an application, a written report on the accuracy and sufficiency of the information …
Last updated: 03 Mar 2026
Appendix C - Proposed TPM drafting for housekeeping changes
… Schedule 12.4 85 15 December 2025 cl 12.93 Schedule 12.4 Transmission Pricing Methodology Schedule 12.4: replaced, on … 4 of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology) 2022. Part A Preliminary 1 … verification means, for an application, a written report on the accuracy and sufficiency of the information …