SO Consultation - Proposed CACTIS
… the asset provided to the system operator (which may be a planning stage asset capability statement, pre- … with the specifications in Chapter 2. connection study report means a report on connection study cases for an asset … The asset owner must establish communication paths for data transmission and agree on datasets for the provision of …
Last updated: 01 Sep 2025
CACTIS Consultation Final
… The system operator is responsible for operating the transmission components of New Zealand's power system, which … of existing assets • conduct power system studies for planning purposes • investigate power system common quality … frames for asset owners to submit a final connection study report, and for the system operator to review it? Q12. Do …
Last updated: 26 Jun 2023
2023 SOSA - Final Appendices - Final Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 08 May 2023
2023 SOSA - Draft Appendices - Consultation Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 01 Dec 2025
System Operator - Resource Adequacy - Dec2025
… 40 Appendix B: JC2 Consulting Report … there is an efficient level of generation and inter-island transmission to manage the uncertainties associated with … for the National Electricity Market (NEM). Informs planning, decision making and opportunities to invest. …
Last updated: 22 Dec 2022
Part D GZ12 West Coast.pdf
… supplied to the region through 110 kV and 66 kV transmission circuits, with two interconnecting transformers … in August 2023. Please refer to the Grid Zone 10 SSF report for more information. SYSTEM SECURITY FORECAST: GRID … 5.1 LIGHT LOAD MITIGATION High voltages can occur when the transmission network is lightly loaded, particularly in …
Last updated: 21 Jan 2025
SO Industry Forum 21 January 2025
… of year, in part driven by outages on grid constraining transmission to upper North Island. • Geothermal at 22%. Te … 3 outage 2 22/02/2025 08/03/2025 Annual Pole 2 outage NZGB Reported NZGB N-1-G margins for 90% weather risk and Base … https://www.transpower.co.nz/system-operator/planning-future/system-security-forecast Security of Supply …
Last updated: 11 Jul 2023
EvolvingSecurityOfSupplyAssessmentsNZ_FINAL.pdf
… of supply, which assesses how much fuel, generation and transmission capacity is available over different time … towards a lower carbon future. 1 See WiTMH monitoring report, New Zealand Steel new electric arc furnace and … MW. Japan – 3% to 8% (a practical metric for short- term planning and coordination as compared to the more “formal” …
Last updated: 23 Oct 2025
Security of Supply Outlook 23 October 2025
… https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment … risks occur in early/mid-December when some planned transmission outages further restrict generation. • In the … capacity risks during 8-9 December during a planned WKM-WRK transmission outage which limits generation export. While …
Last updated: 05 Mar 2026
USI Load Forum - Submission SO Strategy Feb 2026
… (International Energy Agency) Global Energy Review 2025 report key findings on global energy demand “The increase … coordination of real-time dispatch is shared between the transmission system operator (TSO) and one or more … load management, Transpower and the SO has assumed into its planning and operation, while developing the framework for …