Resources
Displaying 71 - 80 of 93
Last updated: 20 Nov 2024
Winter Review 2024_Pubished
… | SYSTEM OPERATOR 2 About this document Purpose This report reviews the performance of the electricity system and … market resources (by type) and required load (including transmission losses) shown by the black dot. The 10th … to security of supply. In the longer term, we are also planning further changes to our website to improve access to …
Winter Review 2024_Pubished.pdf
(PDF 1.33 MB)
Last updated: 19 Feb 2025
2025 RCA S response to submissions
… Margin (SI-WEM); adequacy of generation and north-to- south transmission capacity to meet expected South Island … a section in the Security of Supply Assessment (SOSA) report looking at the implications of increasing the … It could also inform government, and Transpower’s, planning and oversight of the market so that it is better …
2025 RCA S response to submissions.pdf
(PDF 1.07 MB)
Last updated: 23 Dec 2024
Appendix A Grid Configuration.pdf
… forecast used in this SSF uses the same method as the 2023 Transmission Planning Report (TPR) “expected” forecast2 prepared by Transpower, in …
Appendix A Grid Configuration.pdf
(PDF 2.2 MB)
Last updated: 24 Oct 2023
Winter 2023 Review.pdf
… 2023 Review October 2023 About this document 2 Purpose This report reviews the performance of the electricity system and … is a significant asset failure in the generation fleet or transmission network) and sufficient fuel available to … in different ways. Peak demand The failure of generation or transmission assets impacts the ability to meet peak demand. …
Winter 2023 Review.pdf
(PDF 4.53 MB)
Last updated: 13 May 2025
Simply Energy Questions for the SO 30.04.2025
… Independent Resources that operate and are assessed and reported independently from each other. When bidding via … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …
Simply Energy Questions for the SO 30.04.2025.pdf
(PDF 103.65 KB)
Last updated: 04 Jun 2025
MEUG - Security of Supply Assessment June 2025 - Submission
… (SoSA) and we appreciated the chance to discuss this draft report with Transpower’s Chief Executive at a recent member … the electricity sector to build the necessary generation, transmission and distribution infrastructure required to … is highlighted in the Frontier Economics upcoming final report on its review of electricity market performance. • …
MEUG - Security of Supply Assessment June 2025 - Submission.pdf
(PDF 218.51 KB)
Last updated: 09 May 2025
GL-EA-716 Power Plant Dynamic Model Validation and Submission Prerequisites.pdf
… 18 5.3 Validation Report Requirements … Generation Commissioning Process Feasibility Initiation Planning Delivery Commissioning Closeout GL-EA-716 Power … substation where a transformer steps up the voltage to the transmission level. The aggregated model described in the …
Last updated: 21 Mar 2025
GL-EA-404 Generation Commissioning Process
… 10 3. Planning … flow of electricity across Transpower’s high-voltage transmission network. We are responsible for ensuring … you will provide modelling files and a connection studies report. ▪ Validated power system models: the System Operator … to prepare two important datasets as part of a data transmission contract. These are: ▪ a set of indications and …
GL-EA-404 Generation Commissioning Process.pdf
(PDF 1.31 MB)
Last updated: 25 Sep 2024
Schedule - BS.pdf
… output from the Unit that supports the initial charging of transmission circuits and other Assets, and the progressive … Agent must: (a) Inform the System Operator: immediately report the unexpected outage to the System Operator, including reporting to the System Operator the expected time to …
Schedule - BS.pdf
(PDF 338.81 KB)
Last updated: 27 Aug 2024
SO Industry Forum 27 August 2024.pdf
… should the status escalate Current key activities Updating reporting as per routine Next steps No further action … for these in our decision • A wider review of the risk reporting framework is required • SOS processes and … you, and key updates • Review your outages (Generation or transmission) that negatively impact hydro, cancel or defer …
SO Industry Forum 27 August 2024.pdf
(PDF 5.18 MB)