Resources
Displaying 21 - 30 of 95
Last updated: 15 Jan 2026
WUNI2 - Attachment 1 - Need
… our assumptions regarding the physical constraints of the transmission system as well as demand and generation in the … (potential Stages 2 and 3) were identified during Stage 1 planning as necessary to support ongoing regional demand … Our planning studies that support our Transmission Planning Report5 (TPR) regularly assess the needs of the national …
Last updated: 12 Dec 2025
SO Strategy initial engagement
… will take a ten-year forward view, guiding investment planning for the next funding period (the 2028-31 System … evolving electricity sector. Te Kanapu focuses on how the transmission grid needs to evolve to support an electrified … https://www.iea.org/reports/global-energy-review-2025/electricity Chapter 3: …
Last updated: 13 Aug 2025
FAQ - Huapai Substation Residents Meeting 12 Aug 2025 - WEB
… the network. The station is designated for ‘Electricity transmission – Huapai electricity sub-switching station’ … the region's growing needs and supply into Northland, we're planning to extend our designation at 108 Matua Road to … for a 1-in-100-year flood. Beca is drafting a Flood Report to outline the design steps necessary to ensure the …
Last updated: 18 Dec 2024
USI - Attachment 1 - Need for Investment Demand and Generation Scenarios
… | December 2024 2 Figure 1: Upper South Island 220 kV transmission network 1.1.1 Prior investigations and … MCP, 13 February 2013. 5 This review reflected our general planning approach of regularly reviewing demand forecasts … Our planning studies that support our Transmission Planning Report9 (TPR) regularly assess the needs of the national …
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience - Major Capex Proposal
… at Redclyffe with a 110 kV circuit from Redclyffe providing transmission onto Fernhill and Tuai as required. The … Bay The cost to consumers of this unserved energy was reported by the System Operator to be in the range of $232 … replacements needed are as advised by Transpower Asset Planning Management and the works would be programmed over …
Last updated: 05 Mar 2026
MEUG - Submission SO Strategy Feb 2026
… market. We support the adoption of the proposed 10- year planning timeframe and endorse the System Operator’s … costs, through: o Continued year on year increases in transmission and distribution charges, to fund both asset … on the sources relied upon (for example, Tech New Zealand report4 and BCG’s recent report5 on data centre potential). …
Last updated: 18 Jul 2025
Orion Submission Letter May 2025
… Upper South Island long- list consultation. 2 c. Non-transmission solutions process appears procedurally … news from Fonterra has indicated that this facility is planning to convert two coal boilers to wood pellets.4 We … electrification is highly uncertain. Commentary from CentrePort6 suggests that the new vessels will receive shore …
Last updated: 20 Dec 2024
WBoP - Attachment 2 - Overview of need
… for this Major Capex Proposal (MCP). Figure 1: Map of the transmission infrastructure in the Bay of Plenty region The … be found in Chapter 10 of Transpower’s 2023 Transmission Planning Report (TPR) here. The need for investment discussed in this …
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… but a different period can be used where appropriate. Some transmission assets have long lives, greater than 20 years, … investment options have been estimated using concept design reports or internal costs, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
Last updated: 03 Nov 2025
2026 SOSA - Reference Case and Sensitivities Consultation
… for the 10-year modelled period (2026- 2035). We could then report on how the market is actually tracking against this … Margin (SI-WEM): Adequacy of generation and north-to- south transmission capacity to meet expected South Island … https://www.transpower.co.nz/system-operator/planning-future/system-security-forecast …