Resources
Displaying 81 - 90 of 105
Last updated: 27 Mar 2026
Westpower - TPM Operational Review Workstream 1 submission
… that frequent adjustments create uncertainty for network planning and for communicating transmission costs to consumers. Measures that improve … in practice and rely on subjective judgement and self-reporting. We also support clearer rules for staged projects …
Last updated: 20 Nov 2024
Winter Review 2024_Pubished
… | SYSTEM OPERATOR 2 About this document Purpose This report reviews the performance of the electricity system and … market resources (by type) and required load (including transmission losses) shown by the black dot. The 10th … to security of supply. In the longer term, we are also planning further changes to our website to improve access to …
Last updated: 19 Feb 2025
2025 RCA S response to submissions
… Margin (SI-WEM); adequacy of generation and north-to- south transmission capacity to meet expected South Island … a section in the Security of Supply Assessment (SOSA) report looking at the implications of increasing the … It could also inform government, and Transpower’s, planning and oversight of the market so that it is better …
Last updated: 03 Oct 2025
APD Global - CACTIS Submission
… successful connection of complex projects to electricity transmission and distribution networks across ANZ. APD has … asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the Agree … frames for asset owners to submit a final connection study report, and for the system operator to review it? APD …
Last updated: 13 May 2025
Simply Energy Questions for the SO 30.04.2025
… Independent Resources that operate and are assessed and reported independently from each other. When bidding via … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …
Last updated: 14 May 2026
Draft Policy Statement 2026 Consultation Document
… 9 3.2 Security Policy - Emergency Planning … 13 3.4.1 Process to request data from transmission connected load asset owners … Capability Information 3.4.1 Process to request data from transmission connected load asset owners 53. Large loads on … New Zealand Generation Balance (NZGB) is a capacity margin reporting tool that looks 200 days ahead. It is used, by the …
Last updated: 04 Jun 2025
MEUG - Security of Supply Assessment June 2025 - Submission
… (SoSA) and we appreciated the chance to discuss this draft report with Transpower’s Chief Executive at a recent member … the electricity sector to build the necessary generation, transmission and distribution infrastructure required to … is highlighted in the Frontier Economics upcoming final report on its review of electricity market performance. • …
Last updated: 07 May 2025
HVDC - Short List Consultation Main Document
… 12 3.3 Non-transmission solutions … and reliability of the HVDC submarine cables. While planning the cable replacement, we have reviewed other … of the preferred option. These costs are recovered through transmission charges. This document provides an overview of …
Last updated: 15 Jan 2026
WUNI2 - Attachment 4 - Benefits modelling
… 1.3 Generation Expansion Planning … 2.1 Transmission Network … to calculate the benefits of investment options to provide transmission into the WUNI region. The main components of … case results are labeled as Option 0 in the charts in this report. TRANSPOWER NEW ZEALAND | WUNI STAGE 2 PROJECT: MAJOR …
Last updated: 02 Oct 2025
Grid Owner - CACTIS Submission
… asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the … frames for asset owners to submit a final connection study report, and for the system operator to review it? See … and control. This applies to asset owners, other than transmission network owners… [page 20] …