TPM Operational Review - Proposal Workstream 1
… and decisions under the first tranche (workstream 1) of the Transmission Pricing Methodology (TPM) Operational Review … and potential investors. The review should help existing transmission customers and new customers looking to navigate … to persist for at least five years. We cannot validate unreported cases, creating potentially inequitable outcomes. …
Last updated: 07 Oct 2025
System Operator - SOSFIP review consultation - October 2025
… both thermal fuels, and to loss of major generation and/or transmission assets for several months. 1.4 Contingent … a dry year) and making the trigger for commencing increased reporting more deterministic.11 25. After receiving the … system (including generation assets, fuel supplies, the transmission grid and forecast demand) up to three years …
Last updated: 11 Feb 2026
2026 Security of Supply Assessment - Reference Case Assumptions and Sensitivities - Response to Feedback
… Margin (SI-WEM): adequacy of generation and north-to- south transmission capacity to meet expected South Island … Our quarterly Security of Supply Outlooks will then report how investment by the market is tracking against the … information supplied by operators to inform security planning. Noted. Fonterra The Gas reference supply case …
Last updated: 02 Oct 2025
Lodestone Energy Ltd - CACTIS Submission_redacted
… to require models be submitted in the TSAT format – most transmission system operators (TSOs) internationally require … of the CACTIS requirements into their project budgets and planning. This lack of clarity on treatment of existing … frames for asset owners to submit a final connection study report, and for the system operator to review it? Yes. Q12. …
Last updated: 03 Mar 2026
TPM Operational Review 2026 Workstream 1 - Consultation Document
… changes (workstream 1) we are considering as part of the Transmission Pricing Methodology (TPM) Operational Review. … wer.co.nz/public/uncontrolled_docs/TPM%20PIR%20-%20summary%20report.pdf?VersionId=MlG3bDWxN.kf3UNqqxflz2i9LsjbFbdY … leading up to and following an adjustment event? II. when planning to connect to a distribution network, what are your …
Last updated: 22 Apr 2026
Appendix B - CAR - Removal of SSI Adjustment Events April 2026
… an absolute increase in output in the presence of a fixed transmission revenue requirement. Smaller plants reach the … on smaller participants for reasons unrelated to efficient transmission system utilisation. Please also see the … avoided costs of system changes to collect, validate, and report required data, ongoing administrative and assurance …
Last updated: 09 Dec 2025
Otahuhu Whakamaru Line Reconductoring Listed Project - Overview
… A&B lines are an important part of the upper North Island transmission network, connecting Auckland’s network to … due to conductor corrosion. Our condition assessment report concluded that the conductor on this section is at … models covering power system analysis, generation expansion planning, and generation dispatch simulations for the two …
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience Attachment 5 - Application of the Investment Test
… 8 Undiscounted capital costs in both Transpower’s transmission grid and (for Option 3) Unison’s distribution … demand Demand varies by scenario and net benefit is reported for each of the four scenarios. Size, timing, … of $10,000 per MWh, $20,000 per MWh and $50,000 per MWh are reported. Scenario weightings An equally weighted scenario …
Last updated: 22 Apr 2026
Appendix A - CAR - Adjustment Events Batching April 2026
… particular, regulated lines companies, where accounting for transmission cost wash-ups and within year charge changes is … understand, track and account for adjustments in business planning, pricing and regulatory disclosures (in particular … events for different MW capacities 3 TPM PIR - summary report.pdf, page 10. …
Last updated: 07 May 2025
HVDC - Attachment 5 - Investment Test
… options and modelled projects, • cost of losses, including transmission and local losses, and • reserve costs. The … estimated the additional costs required to reinforce the AC transmission network if the HVDC link was removed. As a … parameters Comment Demand scenario Net benefits are reported for each of the EDGS scenarios under consideration. …