Security of Supply Outlook_02April2025
… MW Rankine at full capacity for ~85 days). • Methanex has reportedly been using 50-52TJ/day of gas for their … https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment TRANSPOWER … during periods of increased planned generation and/or transmission outages in April and as we head into winter. …
Last updated: 27 Nov 2025
Security of Supply Review - Winter 2025
… in the 2 Note the total in the Figure 1 also includes transmission losses which is supplied by generators. 3 A … | Transpower https://www.transpower.co.nz/system-operator/planning-future/security-supply-assessment#2025 TRANSPOWER | … record-low total inflows, placing pressure on generation planning heading into winter. These conditions reinforced …