Resources
Displaying 1 - 4 of 4
Last updated: 29 Aug 2025
TP_Sub_Emergency_Reserve_Scheme_28Aug2025 1
… measures to ensure overall unit costs do not exceed VoLL? Somewhat. Having a consistent price structure is … of overall cost of the scheme and limiting that cost to VOLL on a per-MWh basis is likely feasible. Irrespective of … ensure overall costs during an ERS activation are less than VoLL? If so, how do you consider this could be practically …
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… are assigned to unserved demand – the ‘value of lost load’ (VoLL)6 – and the time period over which benefits are … and so there is no reason to think that ‘locking-in’ VoLL, the capping period and so on would prevent parties … is assigned to unserved demand – the ‘value of lost load’ (VoLL), i.e., the value that customers place on network …
Last updated: 29 Sep 2025
FINAL 2025 ITP Glossary
… usually with changed values of voltage and current VoLL Value of Lost Load WACC Weighted Average Cost of …
Last updated: 29 Sep 2025
FINAL 2025 Service Measures Report
… with readiness planning. We use Value of Lost Load (VoLL) as a common input across frameworks, enabling us to … and gauge end users’ expectations. Additionally, we use VoLL to support network enhancement and development …