Resources
Displaying 11 - 20 of 47
Last updated: 25 Nov 2025
s53ZD_Cost_Estimation_24November2025
… 1. The information sought under the s53ZD notice1 via this report is to assist the Commission to: • investigate and … Energy Agency has published “Building the Future Transmission Grid”9, a report that examines investment in … for FY26 FEC = $20.4m -$6.8m 24% 15 2022 Transmission Planning Report.pdf page 64 16 2022 Transmission Planning …
Last updated: 29 Sep 2025
FINAL 2025 ITP Glossary
… TRANSPOWER NEW ZEALAND | 2025 ITP Glossary 2025 Integrated Transmission Plan Glossary September 2025 TRANSPOWER NEW … Time Communications AP5 Asset Performance 5 - N-Security Reporting Asset health and asset health index (AHI) Asset … Integrated Transmission Plan (consists of the Transmission Planning Report, Asset Management Plan and Grid Outputs …
Last updated: 29 Sep 2025
FINAL 2025 ITP Narrative
… TRANSPOWER NEW ZEALAND|2025 Integrated Transmission Plan Narrative 1 2025 Integrated Transmission … documents: the Asset Management Plan (AMP), Transmission Planning Report (TPR), and Service Measures Report (SMR). Together …
Last updated: 28 Apr 2025
Final Submission Emergency Management Bill
… owns and operates New Zealand’s high voltage electricity transmission network (The National Grid). The National Grid … Bill provides no indication of the degree of granularity of reporting required. The proactive reporting proposed under … and very costly, exercise for Transpower; 4.4 The “planning emergency levels of service” requirements need to …
Last updated: 03 Mar 2025
TP_WACC_Attach_C_Castalia_Rational Regulated Response
… Advisory Group. The Rational Response of a Regulated Transmission Company to a Low WACC Report to Transpower 1 May 2014 Confidential Acronyms and … GRS to its network. The GRS rely on forecasts that reflect planning, judgement and attitudes towards risk. Changing …
Last updated: 20 Aug 2025
USI MCP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; major … investment options. • Attachment 10: Power Systems Analysis Report 7.4.1(3) (3) With respect to each investment option … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is …
Last updated: 20 Aug 2025
USI MCP - Attachment 2 - Need Demand and Generation Scenarios
… STAGE 1 | MAJOR CAPEX PROPOSAL 5 Figure 1: USI 220 kV transmission network 1.2 Prior investigations and investment … MCP, 13 February 2013. 5 This review reflected our general planning approach of regularly reviewing demand forecasts … Our planning studies that support our Transmission Planning Report (TPR) regularly assess the needs of the national grid …
Last updated: 26 Jun 2025
TP_Sub_Regulatory Standards Bill
… 10 and 11 of the National Policy Statement for Electricity Transmission (NPSET). The NPSET is national direction under … a review of the Electricity Act, resulting in officials reporting on a misalignment with clause 8(c). We are … The EAG report notes that any takings provisions in the new planning system would need to carefully consider the …
Last updated: 21 Aug 2025
TP_Sub_Future_System_Operation_models_20Aug2025
… is from Transpower as the System Operator for the transmission system of New Zealand. We support the … The consultation paper is supported by analysis from a report by Cambridge Economic Policy Associates (CEPA) on … about roles and responsibilities for dispatch of DER, and planning activities for distribution networks. Note the …
Last updated: 27 Feb 2025
TP_Sub_Appendix_C_Castalia_Response_67_Percentile_WACC_29_Aug14.pdf
… June 2014 3 Castalia, “The Rational Response of a Regulated Transmission Company to a Low WACC” (report prepared for Transpower New Zealand Ltd, 1 May 2014) … electricity (due to a less optimal mix of generation and transmission).Because it is not obvious if economic …