USI MCP - Attachment 7 - Stakeholder consultation
… of other stakeholder engagement activities – including non- transmission solutions – is summarised throughout the … on long list of options September 2023 Transmission Planning Report 2023 February 2024 Request for Proposals for …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 4 - Short list of investment options
… and Generation Scenarios Attachment 3 – Cable Condition Report Attachment 4 – Short-list of Investment Options … 11 2.3 Non-transmission solutions … of options, which fell into three broad categories: 1. Non-transmission options • Alternatives aimed at decreasing or …
Last updated: 09 Oct 2025
Transpower DPP5 Open Letter Submission_7Oct2025
… and Transpower to make better-informed decisions about transmission and distribution investment needs, ensuring … forecasting frameworks underpin cost-effective network planning and support the transition to a highly electrified, … mechanisms play out. Specifically, as the CEPA (2018) report demonstrated,1 the incentives between opex and capex …
Last updated: 07 Aug 2025
Submission Te Waihanga Draft NIP- August 2025
… and avoid being a barrier to, electrification • Spatial planning provides an opportunity for Transpower, but it must … regulatory framework for planning and consenting of transmission infrastructure • A cohesive and enduring … and Conservation Authority 2024, Electric Homes Technical Report …
Last updated: 17 Mar 2025
TP_Sub_ Modernising conservation land management_redacted_Mar2025
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
Last updated: 20 Aug 2025
USI MCP Overview Document
… 2.3 Transmission capacity and constraints … are uncertainties. We have used a prudent forecast in our planning to ensure we have time to invest without putting … pricing impacts; o Attachment 10 – Power Systems Analysis Report; and o Attachment 11 – CEO Certification. 8 Next …
Last updated: 28 Feb 2025
TP_Sub_ Modernising conservation land management redacted
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
Last updated: 09 Sep 2025
HVDC MCP Main overview document
… and generation scenarios o Attachment 3 – Cable Condition Report o Attachment 4 – Short-list of investment options o … o Attachment 8 – Stakeholder engagement o Attachment 9 – Transmission Pricing Methodology and Indicative Pricing … 2024) 14: This consultation discussed the need to begin planning for the replacement of the submarine cables. …
Last updated: 23 May 2025
20250520 Final submission NEMA Discussion Doc
… Document). It is difficult to overstate the importance of planning for events, for communities, lifeline utilities and … risk reduction through modern designs that ensured the transmission service was not interrupted even when the … or direction. In our view, common event situation reporting templates for use by critical infrastructure …
Last updated: 20 Aug 2025
USI MCP - Attachment 5 - Costing
… and include expenses related to consenting and designation. Transmission lines construction works This includes material … with input from protection and automation SMEs and system planning. Total 77.2 164.0 165.5 4 Cost estimate of … • Technical reviews. • Performance monitoring and reporting. Transpower will allocate experienced management …