Resources
Displaying 101 - 110 of 211
Last updated: 06 Mar 2014
Mangamaire Grid Reconfiguration June Update.pdf
… energy not served is around $270 with a value of lost load (VOLL) of $20,000 per MWh. The upper bound for expected …
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… 527.1 Capital decrease (70% of base) 767.3 788.8 774.5 High VoLL ($60,000/MWh) 751.2 791.2 767.6 Low VoLL ($20,000/MWh) 617.5 628.2 603.7 The sensitivity …
Last updated: 15 Dec 2020
Meridian submission on TPM Options Consultation, Part B.pdf
… broadly reasonable. However, given the value of lost load (VoLL) basis for the approach, the allocation of reliability … – for generators the benefit would not be based on VoLL but on the value of lost generation at prevailing spot …
Last updated: 15 Jun 2018
Engagement Paper 3 (June 2018).pdf
… results of our recently completed Value of Lost Load (VoLL) study for measures AP2 and AP3, identifying which … the amount of load being served at a POS multiplied by the VoLL at that POS, and is the expected dollar cost of an … like access to more detailed information on the demand and VoLL assumptions. Engagement Question 2 As a result of …
Last updated: 18 Oct 2024
HVDC Single Pole Risk Classification.pdf
… similar to the last two years. • Value of Lost Load (VoLL) is $32,700/MWh. This is the value found in the … 4 Transpower as Grid Owner recently consulted regarding VoLL. For more information, please refer to Waikato Regional …
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… are assigned to unserved demand – the ‘value of lost load’ (VoLL)6 – and the time period over which benefits are … and so there is no reason to think that ‘locking-in’ VoLL, the capping period and so on would prevent parties … is assigned to unserved demand – the ‘value of lost load’ (VoLL), i.e., the value that customers place on network …
Last updated: 18 Mar 2013
ea-submission-on-transmission-pricing-methodology.pdf
… are assigned to unserved demand – the ‘value of lost load’ (VoLL)6 – and the time period over which benefits are … and so there is no reason to think that ‘locking-in’ VoLL, the capping period and so on would prevent parties … is assigned to unserved demand – the ‘value of lost load’ (VoLL), i.e., the value that customers place on network …
Last updated: 23 Sep 2022
2022 ITP Glossary.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene …
Last updated: 23 Sep 2022
2022 ITP Glossary.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene …
Last updated: 03 Sep 2021
Integrated Transmission Plan - Glossary 2021.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene …