BRK-SFD Long List Consultation.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL, also known as Value of Expected Unserved Energy) is … Schedule 12.2 of the code Question 10: Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? … for this investigation? 10. Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? …
Last updated: 23 Jun 2026
Workshop slides - workshop 3
… report on use of ER • Details of ER use • Comparison with VoLL costs Pre-event costs only 22 Looking ahead to workshop …
Last updated: 15 Dec 2020
MEUG submission on TPM Options Consultation, Part B and Part C.pdf
… not be based on a single or small number of generalised VoLL estimates. Transpower proposes to depart from the …
Last updated: 27 Sep 2019
2017 ITP Services Report.pdf
… them against our estimated Value of Lost Load (VoLL). Generally the RCP 2 targets determined using these … of this review includes a review of value of lost load (VoLL) which is a key input into the categorisation review. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer …
Last updated: 26 Sep 2017
2017 ITP Services Report.pdf
… them against our estimated Value of Lost Load (VoLL). Generally the RCP 2 targets determined using these … of this review includes a review of value of lost load (VoLL) which is a key input into the categorisation review. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer …
Last updated: 07 Dec 2016
TP_Sub_Extended_Reserves_Selection_Methodology_29Nov2016.pdf
… set out in the data specification? We assume this very high VOLL has some basis. We agree with tighter specification for …
Last updated: 29 Sep 2025
FINAL 2025 ITP Glossary
… usually with changed values of voltage and current VoLL Value of Lost Load WACC Weighted Average Cost of …
Last updated: 15 Dec 2020
ENA submission on TPM Options Consultation, Part B and Part C.pdf
… number of important input assumptions (eg: the $ value of VoLL or the operational $ cost of generators) that are …
Last updated: 12 Nov 2014
Arapuni Grid Reconfiguration August 2011.pdf
… ‘south’ bus generation, 0.5 hours to restore connection, a VOLL of $20000/MWh, the energy not served costs are 45% …
Last updated: 08 Nov 2021
Grid Outputs Report 2021.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks, enabling us to … and gauge end users’ expectations. Additionally, we use VoLL to support network enhancement and development …