Resources
Displaying 121 - 130 of 211
Last updated: 15 Dec 2020
ENA submission on TPM Options Consultation, Part B and Part C.pdf
… number of important input assumptions (eg: the $ value of VoLL or the operational $ cost of generators) that are …
Last updated: 12 Nov 2014
Arapuni Grid Reconfiguration August 2011.pdf
… ‘south’ bus generation, 0.5 hours to restore connection, a VOLL of $20000/MWh, the energy not served costs are 45% …
Last updated: 08 Nov 2021
Grid Outputs Report 2021.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks, enabling us to … and gauge end users’ expectations. Additionally, we use VoLL to support network enhancement and development …
Last updated: 01 Oct 2019
Bunnythorpe-Wilton Preferred Option Summary of Submissions.pdf
… have been used. For estimating reliability benefits VoLL has been applied to the 2018 TPR demand scenarios. For …
Last updated: 02 Oct 2018
Bunnythorpe-Wilton Preferred Option Summary of Submissions.pdf
… have been used. For estimating reliability benefits VoLL has been applied to the 2018 TPR demand scenarios. For …
Last updated: 16 Jan 2017
ERTRS - Summary of Submissions.pdf
… that the efficient procurement benefit using the Authority VoLL criteria is controversial. For example, if the same … load was moved to a different part of the North Island, the VoLL would not be the same and therefore should not be … Because it is highly controversial, the inclusion of VoLL misleads to the point of raising serious doubt whether …
Last updated: 10 Sep 2014
TP_Sub_Appendix_A_Frontier_Loss_Function_Report_29_Aug14.pdf
… 23 The Electricity Authority’s recent Value of Lost Load (VoLL) technical report found that the value of unserved … of customer. 24 The Technical Report referred to a 2010 VoLL survey which found that the value (in $/MWh) of … outage, the Technical Report found consumption-weighted VoLLs of: 26 $14,900/MWh in Auckland $18,690/MWh in …
Last updated: 22 Sep 2022
2022 Service Measures Report.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks, enabling us to … and gauge end users’ expectations. Additionally, we use VoLL to support network enhancement and development …
Last updated: 25 Nov 2020
AHNR Development Roadmap 24 Nov 2020.pdf
… has used an estimated restoration time, Value of Lost Load (VoLL) and average load for the site/corridor. The … major events are measured in days not hours. The use of VoLL for events beyond 12-18 hours generally results in very …
Last updated: 12 Sep 2019
Waikato and Upper North Island Voltage Management Summary of Short-list Submissions test.pdf
… Pricing Methodology, defined in Schedule 12.4 of the Code. VoLL Value of lost load. WUNI Waikato and Upper North … critical feeders where: - feeders have a materially higher VoLL - excluding them reduces the total cost of the scheme …