Resources
Displaying 131 - 140 of 202
Last updated: 02 Aug 2018
TP Securing our Energy Future - 2 August 2018 1416.pdf
… GP1 and GP2 this also includes the Value of Lost Load (VoLL) and how to group Points of Service (POS). For the HVDC … Economic Consequence’ sub-category after revisiting the VoLL information. This change is outlined further in the … interruptions), Transpower can use the value of lost load (VoLL) as a measure of the economic benefit of improved …
TP Securing our Energy Future - 2 August 2018 1416.pdf
(PDF 6.39 MB)
Last updated: 02 Aug 2018
TP Securing our Energy Future - 2 August 2018.pdf
… GP1 and GP2 this also includes the Value of Lost Load (VoLL) and how to group Points of Service (POS). For the HVDC … Economic Consequence’ sub-category after revisiting the VoLL information. This change is outlined further in the … interruptions), Transpower can use the value of lost load (VoLL) as a measure of the economic benefit of improved …
TP Securing our Energy Future - 2 August 2018.pdf
(PDF 6.39 MB)
Last updated: 31 Jul 2018
TP Securing our Energy Future - 31 July 2018.pdf
… GP1 and GP2 this also includes the Value of Lost Load (VoLL) and how to group Points of Service (POS). For the HVDC … Economic Consequence’ sub-category after revisiting the VoLL information. This change is outlined further in the … interruptions), Transpower can use the value of lost load (VoLL) as a measure of the economic benefit of improved …
TP Securing our Energy Future - 31 July 2018.pdf
(PDF 6.41 MB)
Last updated: 05 Oct 2020
Asset-Health-and-Network-Risk-An-industry-review-for-Transpower-NZ.pdf
… to HILP events than would be calculated through lost load (VOLL) or VCR assessments but maintaining a reasonable … risk aversion. – The use of an alternate metric to VCR or VOLL may provide a more robust input for monetising the … and lastly stated preference methods. Existing VCR and VOLL are generally stated preference benefits techniques. …
Last updated: 10 May 2021
GOR 2020.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks. It enables us to … through our criticality framework (which uses VoLL), where applicable. Our overall price-quality testing …
GOR 2020.pdf
(PDF 1.27 MB)
Last updated: 29 Sep 2020
GOR 2020.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks. It enables us to … through our criticality framework (which uses VoLL), where applicable. Our overall price-quality testing …
GOR 2020.pdf
(PDF 1.27 MB)
Last updated: 15 Dec 2020
All submissions on TPM Options Consultation.pdf
… number of important input assumptions (eg: the $ value of VoLL or the operational $ cost of generators) that are … broadly reasonable. However, given the value of lost load (VoLL) basis for the approach, the allocation of reliability … – for generators the benefit would not be based on VoLL but on the value of lost generation at prevailing spot …
All submissions on TPM Options Consultation.pdf
(PDF 7.48 MB)
Last updated: 25 Mar 2025
Orion - SOSFIP Review - Issues Paper Questions - March 2025
… at more than $37.5 million using the Value of Lost Load (VoLL) set out in the Code, with other estimates suggesting …
Orion - SOSFIP Review - Issues Paper Questions - March 2025.pdf
(PDF 274.67 KB)
Last updated: 09 Aug 2021
Assurance Ernst Young.pdf
… for control parameters such as the Value of Lost Load (VoLL) and risk aversion. There are several control …
Assurance Ernst Young.pdf
(PDF 235.99 KB)
Last updated: 05 Jul 2024
System operator preliminary report - Northland loss of supply v1.pdf
… network means the estimated value of lost load (VoLL) will be large. A calculation of VoLL will be included in the final report. 4.4 Restoration … Upper North Island Reactive Power Controller VLD Vector VoLL Value of lost load TRANSPOWER NEW ZEALAND | System …