Resources
Displaying 161 - 170 of 222
Last updated: 09 Nov 2020
TPM Options Consultation - PART A. Overview.pdf
… TPM Transmission pricing methodology USI Upper South Island VoLL Value of Lost Load vSPD Vectorised Scheduling, pricing …
Last updated: 09 Aug 2017
Busbar Classification - Recommendations from Updated Credible Event Methodology.pdf
… calculated. Where load was lost or shed involuntarily, a VOLL of $25,000/MWh was used to calculate the cost of these … and is the Electricity Authority’s Value of Lost Lost (VoLL). See the Load Duration Curve section for how the … unplanned load shedding and is the Electricity Authority’s VoLL. 3.5.3.3.5 Duration When considering CE classification …
Last updated: 29 Jun 2017
Busbar Classification Review.pdf
… calculated. Where load was lost or shed involuntarily, a VOLL of $25,000/MWh was used to calculate the cost of these … and is the Electricity Authority’s Value of Lost Lost (VoLL). See the Load Duration Curve section for how the … unplanned load shedding and is the Electricity Authority’s VoLL. 3.5.3.3.5 Duration When considering CE classification …
Last updated: 13 Dec 2019
WUNIVM Major Capex Proposal.pdf
… in the WUNI region we have used a Value of Lost Load (VoLL) equal to $26,500/MWh. This number is based on the … -$21 -$14 $8 EDGS Global $0 -$579 $90 $93 $24 $24 $34 +50% VoLL $0 -$566 $241 $240 $188 $155 $124 -50% VoLL $0 -$792 $59 $61 -$20 -$21 -$4 95% HLY U5 availability …
Last updated: 11 Aug 2025
TPM Information Sheet - BBC Standard Methods v3
… across the market scenarios) and the value of lost load (VoLL, as defined in the TPM) or value of lost generation …
Last updated: 20 Nov 2023
Upper South Island Summary of Submissions November 2023
… for our proposed discount rates and value of lost load (VOLL). Christchurch Airport have suggested that we use a …
Last updated: 14 Aug 2024
Waikato Regional Interconnection Capacity Project - Summary of submissions.pdf
… unserved energy? Four submitters agreed with the proposed VoLL with Waipā Networks noting that “the sensitivity …
Last updated: 05 Dec 2022
NZGP1 MCP ATTACHMENT C - OPTIONS REPORT.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL – also known as Value of Expected Unserved Energy), is … The Electricity Industry Participation Code specifies that VoLL should be $20,000/MWh. This value was determined in … inflation, equates to approximately $29,500/MWh in $2022. VoLL is not relevant to this analysis and the value has not …
Last updated: 26 Mar 2014
Frontier_Economics_for_Transpower_ WACC-range-13-March-2014.pdf
… 17 The Electricity Authority’s recent Value of Lost Load (VoLL) technical report found that the value of unserved … of customer. 18 The Technical Report referred to a 2010 VoLL survey which found that the value (in $/MWh) of …
Last updated: 21 Nov 2023
Service Measures Report 2023.pdf
… with contingency planning. We use Value of Lost Load (VoLL) as a common input across frameworks, enabling us to … and gauge end users’ expectations. Additionally, we use VoLL to support network enhancement and development … is typically at least an order of magnitude lower than VoLL • separating generator PoS by size could be a market …