Resources
Displaying 171 - 180 of 202
Last updated: 27 Apr 2023
TPM Consultation NZGP phase 1 starting BBI customer allocations (Draft Record - HVDC Reactive Support ).pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load …
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… environmental impacts of adverse grid events. of Lost Load (VoLL). Also refer to question 6 in this table. 3. Do you …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… environmental impacts of adverse grid events. of Lost Load (VoLL). Also refer to question 6 in this table. 3. Do you …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 29 Mar 2022
SOSFIP and EMP consultation 2022.pdf
… associated with the timing and occurrence of this response. VoLL Value of Lost Load SOSFIP/EMP Review 2022 – …
SOSFIP and EMP consultation 2022.pdf
(PDF 1.42 MB)
Last updated: 09 Aug 2021
Proposed TPM 30 June 2021 compared TPM Preliminary Drafting 3 May 2021.docx
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI — 0. if the reliability … group is a regional demand group , the reliability BBI’s VOLL ; or (b) if the regional customer group is a regional … reliability disbenefit) V is the relevant reliability BBI’s VOLL . S is the number of market scenarios for the …
Last updated: 25 May 2021
43. 03 May 2021 - TPM Development Checkpoint 2B resubmission to the Electricity Authority (preliminary drafting of proposed TPM).pdf
… of commissioned asset has the meaning in the Transpower IMs VOLL means, for a reliability BBI— (a) if the reliability … reliability disbenefit) V is the relevant reliability BBI’s VOLL. (5) The illustrative system limit model below shows …
Last updated: 22 Nov 2018
RCP3 Expenditure Proposal_ Final IV Report.pdf
… and consumers; o explores the feasibility of estimating VoLL for each category of points of service so that, for the … in RCP3, it can set incentive rates that are linked with VoLL; and o reports the estimated unserved energy along with … being served at a POS multiplied by the value of loss load (VoLL) at that POS. This calculation reflects the expected …
RCP3 Expenditure Proposal_ Final IV Report.pdf
(PDF 4.97 MB)
Last updated: 27 Apr 2023
TPM Consultation NZGP phase 1 starting BBI customer allocations (Draft Record - CNI).pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load …
Last updated: 08 Nov 2024
design-features-for-grid-support-contracts.pdf
… pricing methodology, defined in Schedule 12.4 of the Code VOLL Value of lost load Grid Support Contracts © Transpower …
design-features-for-grid-support-contracts.pdf
(PDF 685.99 KB)
Last updated: 30 Jun 2022
NZGP1 Shortlist Version For Publication.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL), which is also known as Value of Expected Unserved … levels of reliability of supply. The Code specifies that VoLL should be $20,000/MWh. This value was determined in …
NZGP1 Shortlist Version For Publication.pdf
(PDF 2.43 MB)