Resources
Displaying 191 - 200 of 202
Last updated: 25 May 2021
47. 24 May 2021 - Letter from EA (Transpower TPM Checkpoint 2B resubmission Appendix E comments on preliminary drafting of proposed TPM).pdf
… of commissioned asset has the meaning in the Transpower IMs VOLL means, for a reliability BBI— (m) if the reliability … reliability disbenefit) V is the relevant reliability BBI’s VOLL. (5) The illustrative system limit model below shows …
Last updated: 13 Sep 2022
Waikato and Upper North Island Voltage Management long-list consultation_2.pdf
… North Island Dynamic Reactive Support (a specific GUP) VOLL Value of lost load WUNI Waikato and Upper North Island …
Last updated: 21 Nov 2023
RCP4 Independent Verification Report.pdf
… e.g., spare capacity, back feed capability, use of standard VoLL, demand forecast, N/N-1 constraints, unserved energy, … contributes to partial realisation of Value of Lost Load (VOLL), opex efficiency and capex reduction benefits gained … SCADA systems. It will enable the full realisation of VOLL, opex efficiency and capex reduction benefits gained …
RCP4 Independent Verification Report.pdf
(PDF 11.18 MB)
Last updated: 15 Sep 2023
IV RCP4 report - Final 2023.09.12.pdf
… e.g., spare capacity, back feed capability, use of standard VoLL, demand forecast, N/N-1 constraints, unserved energy, … contributes to partial realisation of Value of Lost Load (VOLL), opex efficiency and capex reduction benefits gained … SCADA systems. It will enable the full realisation of VOLL, opex efficiency and capex reduction benefits gained …
IV RCP4 report - Final 2023.09.12.pdf
(PDF 11.18 MB)
Last updated: 28 Sep 2015
TP AMP 2015.pdf
… the value of reliability (termed the value of lost load, or VoLL) within our framework for setting reliability targets • …
TP AMP 2015.pdf
(PDF 2.42 MB)
Last updated: 02 Sep 2022
2021 Asset Management Plan
… to our decision framework • investigate an alternative to VoLL that could help inform resilience investments, … safety factors and likely collateral damage, asset specific VOLL etc., and coordination of works with customer, Auckland …

Last updated: 22 Feb 2022
2021 Asset Management Plan.pdf
… to our decision framework • investigate an alternative to VoLL that could help inform resilience investments, … safety factors and likely collateral damage, asset specific VOLL etc., and coordination of works with customer, Auckland …
2021 Asset Management Plan.pdf
(PDF 8.53 MB)
Last updated: 22 Feb 2022
2021 Asset Management Plan.pdf
… to our decision framework • investigate an alternative to VoLL that could help inform resilience investments, … safety factors and likely collateral damage, asset specific VOLL etc., and coordination of works with customer, Auckland …
2021 Asset Management Plan.pdf
(PDF 8.53 MB)
Last updated: 03 Sep 2021
Asset Management Plan 2021.pdf
… to our decision framework • investigate an alternative to VoLL that could help inform resilience investments, … safety factors and likely collateral damage, asset specific VOLL etc., and coordination of works with customer, Auckland …
Asset Management Plan 2021.pdf
(PDF 8.53 MB)
Last updated: 29 Sep 2020
AMP 2020.pdf
… safety factors and likely collateral damage, asset specific VOLL etc., and coordination of works with customer, Auckland …
AMP 2020.pdf
(PDF 9.22 MB)