MEUG to TPNZ, Bunnythorpe to Wilton line reconductoring, 19-Oct-16.pdf
… to be used in Investment Tests. 8. Do you consider this VoLL ($25,300/MWh) appropriate for valuing unserved energy? … this Investment Test assumption. 9. Do you consider this VoLL appropriate for valuing lost load for your business? If, not, what alternative VoLL would you recommend and what evidence are you able to …
Last updated: 01 Mar 2018
MEUG to TPNZ, Bunnythorpe to Wilton line reconductoring, 19-Oct-16.pdf
… to be used in Investment Tests. 8. Do you consider this VoLL ($25,300/MWh) appropriate for valuing unserved energy? … this Investment Test assumption. 9. Do you consider this VoLL appropriate for valuing lost load for your business? If, not, what alternative VoLL would you recommend and what evidence are you able to …
Last updated: 09 Aug 2017
Busbar Classification July 17 - Summary of Submissions.pdf
… and ROS 22kV bus. 5 WEL Networks queried whether the VOLL used in the assessment should be per customer category. … we do not believe it is appropriate to use specific VOLL per customer category. To do so would require a level …
Last updated: 08 Oct 2018
Focus Group session slides 21 June 18.pdf
… • results of our recently completed Value of Lost Load (VoLL) study • for measures AP2 and AP3, identifying which … the amount of load being served at a POS multiplied by the VoLL at that POS, and is the expected dollar cost of an … are broken down broadly into the following types: Step 2: A VoLL for each type of consumer is established. Step 3: The …
Last updated: 28 Sep 2015
TP Services Report.pdf
… This is traditionally termed the ‘value of lost load’ (or VoLL) in New Zealand. There are limits on the usefulness of VoLL information (most of our grid connection points serve a … but it is worth investigating whether we can use better VoLL information to improve the economic basis for our …
Last updated: 15 Dec 2020
NZ Steel submission on TPM Options Consultation, Part B and Part C.pdf
… Standard Method – customer benefit, reliability. A standard VoLL number is not an appropriate measure for direct connect … re “…it varies widely by the type of load…”. Also para 231 ”VoLL is therefore likely to be situationally specific and …
Last updated: 01 Oct 2019
BPE-WIL A Reconductoring Preferred Option.pdf
… rate as outlined in the Capex IM. • Value of Lost Load (VoLL): $25,300/MWh based on the Code8-defined as $20k/MWh in … / +25% • Discount rate: +4% / + 10% • Reliability: +25% • VoLL: -50% / +50% Each row shows the impact from changing … 25% -$ 8.2m $ 17.1m $ 17.1m $ 17.2m $ 17.8m $ 18.0m $ 21.2m VoLL -50% -$ 8.2m -$ 1.9m -$ 1.9m -$ 1.8m -$ 1.2m -$ 0.9m $ …
Last updated: 15 Mar 2018
BPE-WIL A Reconductoring Preferred Option.pdf
… rate as outlined in the Capex IM. • Value of Lost Load (VoLL): $25,300/MWh based on the Code8-defined as $20k/MWh in … / +25% • Discount rate: +4% / + 10% • Reliability: +25% • VoLL: -50% / +50% Each row shows the impact from changing … 25% -$ 8.2m $ 17.1m $ 17.1m $ 17.2m $ 17.8m $ 18.0m $ 21.2m VoLL -50% -$ 8.2m -$ 1.9m -$ 1.9m -$ 1.8m -$ 1.2m -$ 0.9m $ …
Last updated: 29 May 2020
Contact submission CUWLP 2020.pdf
… in spill and fuel costs, while under an import scenario VOLL costs should be included. Both circuits are on the same … would increase with the decarbonisation of regional demand. VOLL costs need to be considered in the CBA under these … while CUWLP works were being completed. We consider that VOLL costs need to be factored into the CBA under these …
Last updated: 22 Jun 2020
BOB-OTA MCP - Attachment C - Options and costing report.pdf
… the SPS itself plus the expected unserved energy valued at VoLL was included in the overall costs b. using demand … in the Bombay region we have used a Value of Lost Load (VoLL) of $26,400/MWh for Bombay and $27,800/MWh for Wiri … these values as we consider them a better representation of VoLL at these GXPs. We note that our sensitivity range fully …