Resources
Displaying 51 - 60 of 211
Last updated: 29 May 2020
Contact submission CUWLP 2020.pdf
… in spill and fuel costs, while under an import scenario VOLL costs should be included. Both circuits are on the same … would increase with the decarbonisation of regional demand. VOLL costs need to be considered in the CBA under these … while CUWLP works were being completed. We consider that VOLL costs need to be factored into the CBA under these …
Last updated: 22 Jun 2020
BOB-OTA MCP - Attachment C - Options and costing report.pdf
… the SPS itself plus the expected unserved energy valued at VoLL was included in the overall costs b. using demand … in the Bombay region we have used a Value of Lost Load (VoLL) of $26,400/MWh for Bombay and $27,800/MWh for Wiri … these values as we consider them a better representation of VoLL at these GXPs. We note that our sensitivity range fully …
Last updated: 01 Jul 2015
Transpower-2015_16-Initiatives-Plan.pdf
… This is traditionally termed the “value of lost load” (or VoLL) in New Zealand. There are limits on the usefulness of VoLL information (most of our grid connection points serve a … but it is worth investigating whether we can use better VoLL information to improve the economic basis for our …
Last updated: 24 May 2017
Service Performance Measure Refresh RCP3_ April 2017.pdf
… by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer … category (min/yr) GP2 Categorisation to be aligned with VoLL Availability % availability of HVDC AP1 Refined to …
Last updated: 07 Sep 2017
Battery Storage in New Zealand.pdf
… factors that go into determining the Value of lost load (Voll) for each customer classification and geographical … Our assumption in this report is based on the 2013 EA Voll Survey6 Table 1. Refer to Appendix for a break-down by … - Report on methodology and key findings, 23 July 2013 VOLL: http://www.ea.govt.nz/dmsdocument/15385 …
Last updated: 07 Sep 2017
Battery Storage in New Zealand.pdf
… factors that go into determining the Value of lost load (Voll) for each customer classification and geographical … Our assumption in this report is based on the 2013 EA Voll Survey6 Table 1. Refer to Appendix for a break-down by … - Report on methodology and key findings, 23 July 2013 VOLL: http://www.ea.govt.nz/dmsdocument/15385 …
Last updated: 01 Nov 2018
Feedback Summary - July 2018.pdf
… Economic Consequence” sub- category after we revisited the VoLL information. This update is reflected in Appendix 1. 1 … the POSs at HUI and MNI. At HUI, the value of lost load (VoLL) was based on the assumption that consumption is split … plant, which if taken into account would result in a higher VoLL. With this higher VoLL, the economic consequence of HUI …
Last updated: 30 Jul 2018
Feedback summary July 2018.pdf
… Economic Consequence” sub- category after we revisited the VoLL information. This update is reflected in Appendix 1. 1 … the POSs at HUI and MNI. At HUI, the value of lost load (VoLL) was based on the assumption that consumption is split … plant, which if taken into account would result in a higher VoLL. With this higher VoLL, the economic consequence of HUI …
Last updated: 31 Mar 2017
Service Performance Measure Refresh RCP3 - Focus Group Feb 2017.pdf
… we are considering a more quantitative approach based on: – VoLL x average energy being supplied. • Advantages of … energy differences between POS while still recognising that VoLL may vary for different loads being supplied. – More …
Last updated: 01 Oct 2019
Bunnythorpe-Wilton (JFD-WIL) Reconductoring Long-list Consultation_1.pdf
… high-voltage electricity network (the national grid). VOLL Value of lost load – equivalent to the value of … Value of expected unserved energy The Value of Lost Load (VoLL, also known as Value of Expected Unserved Energy) is … investigation? Question 8: Do you consider this VoLL ($25,300/MWh) appropriate for valuing unserved energy? …