Resources
Displaying 61 - 70 of 222
Last updated: 31 Mar 2017
Service Performance Measure Refresh RCP3 - Focus Group Feb 2017.pdf
… we are considering a more quantitative approach based on: – VoLL x average energy being supplied. • Advantages of … energy differences between POS while still recognising that VoLL may vary for different loads being supplied. – More …
Last updated: 01 Oct 2019
Bunnythorpe-Wilton (JFD-WIL) Reconductoring Long-list Consultation_1.pdf
… high-voltage electricity network (the national grid). VOLL Value of lost load – equivalent to the value of … Value of expected unserved energy The Value of Lost Load (VoLL, also known as Value of Expected Unserved Energy) is … investigation? Question 8: Do you consider this VoLL ($25,300/MWh) appropriate for valuing unserved energy? …
Last updated: 30 Jul 2024
WBoP - Attachment 6 - Benefits modelling.pdf
… Benefits = Probability of event × (Unserved Energy × VoLL + Repair costs) We consider the following events and … outage, with 8 hours valued at the full Value of Lost Load (VoLL) and the remained at 20% of the value of unserved … cost: HILP event cost = Average(Demand profile ∗ Filter) × VoLL + Repair cost The risk is given by the annual expected …
Last updated: 05 Feb 2021
7. 01 Oct 2020 - TPM Development Checkpoint 1 re-submission to the Electricity Authority (Benefit-Based Charge).pdf
… requirements, Regional network model, Value of lost load (VoLL) Assumption Book on a time bound review and … Load Forecast, Generation Forecast, Value of Lost Load (VOLL), Value of Foregone Generation (VOFG) Power Systems … volume used for both load and generation. Load valued at VoLL, generation at VoFG 0% X% 100% Demand limit after …
Last updated: 27 Jan 2021
7. 01 Oct 2020 TPM Development Checkpoint 1 re-submission to the Electricity Authority (Benefit-Based Charge).pdf
… requirements, Regional network model, Value of lost load (VoLL) Assumption Book on a time bound review and … Load Forecast, Generation Forecast, Value of Lost Load (VOLL), Value of Foregone Generation (VOFG) Power Systems … volume used for both load and generation. Load valued at VoLL, generation at VoFG 0% X% 100% Demand limit after …
Last updated: 04 Sep 2018
Mercury NZ Limited.pdf
… performance incentives. Just as Transpower is considering VoLL as a way to benchmark the reliability incentive … connection locations for load can be expressed in terms of VoLL. For generation connection locations, the AC …
Last updated: 24 May 2017
MEUG to TPNZ, Services Engagement Paper #2, 28-Apr-17.pdf
… required for the new approach, such as Value of Loss Load (VoLL), while not arbitrary do have wide error bounds. Estimating and then applying VoLL is complicated by the inherent non-linearity that can …
Last updated: 13 Oct 2016
Bells Pond-Waitaki transmission constraint - proposed approach informati....pdf
… the value of expected unserved energy (value of lost load, VoLL) = $ 20,000/MWh Fixed cost per outage: The fixed cost … cost of SO initiated planned load shedding is valued at VoLL, $ 20,000/MWh System losses are valued at the …
Last updated: 05 Mar 2021
TPM Options Consultation Summary and Response.pdf
… 36. MEUG and NZ Steel disagreed with using a single VoLL for all load customers. For example, MEUG thought “The … not be based on a single or small number of generalised VoLL estimates”. Similarly, NZ Steel submitted: “A standard VoLL number is not an appropriate measure for direct connect …
Last updated: 22 Jun 2020
BOB-OTA Major Capex Proposal.pdf
… based on the MBIE 2019 EDGS29. • To determine the cost of VoLL at specific GXPs, we use a VoLL of 26,400/MWh for Bombay and 27,800/MWh for Wiri (along … these values as we consider them a better representation of VoLL at these GXPs than $20,000/MWh. We note that our …