Resources
Displaying 71 - 80 of 202
Last updated: 22 Nov 2018
TP Asset Criticality Framework 2018 - FINAL.pdf
… power system model provides loads lost across all POSs, and VoLL is applied to these loads to monetise the consequence. The VoLL value utilised in the calculation for each POS was extrapolated from our VoLL survey in 2016. • A probability is not applied to the …
TP Asset Criticality Framework 2018 - FINAL.pdf
(PDF 1.08 MB)
Last updated: 20 Dec 2019
BOB-OTA Short-list Consultation.pdf
… the SPS itself plus the expected unserved energy valued at VoLL was included in the overall costs b. using demand … consistent with MBIE’s EDGS10. • To determine the cost of VoLL at specific GXPs, we use a VoLL of 26,400/MWh for Bombay and 27,800/MWh for Wiri (along …
BOB-OTA Short-list Consultation.pdf
(PDF 1.01 MB)
Last updated: 27 Jun 2023
Transpowe submission on 2023 Draft advice to inform the second ERP
… are changing existing understanding). • Value of Lost Load (VOLL) currently used to justify asset reliability investment … the Government’s second emissions reduction plan, p.112 5 VOLL estimates do not include risk aversion or societal cost in relation to a catastrophic event. In addition, the VOLL estimate is not based on long duration outages. …
20230620 - Transpower submission on ERP2 draft advice .pdf
(PDF 339.62 KB)
Last updated: 05 Dec 2019
Busbar Classification for Frequency.pdf
… pre-contingent SIR procurement. The Value of Lost Load (VoLL) of $26,500 is based on the value specified in the Code … is determined separately for each bus. Some costs, like VoLL are consistent across all cases studied. ‘Other’ costs, … or shed involuntarily i.e. AUFLS blocks tripping, we use a VOLL of $26,500/MWh to price the cost of these loads. This …
Busbar Classification for Frequency.pdf
(PDF 1.67 MB)
Last updated: 29 Oct 2019
Busbar Classification for Frequency v0.2.pdf
… pre-contingent SIR procurement. The Value of Lost Load (VoLL) of $26,500 is based on the value specified in the Code … is determined separately for each bus. Some costs, like VoLL are consistent across all cases studied. ‘Other’ costs, … or shed involuntarily i.e. AUFLS blocks tripping, we use a VOLL of $26,500/MWh to price the cost of these loads. This …
Busbar Classification for Frequency v0.2.pdf
(PDF 1.72 MB)
Last updated: 25 Aug 2023
USI2 - Attachment 5 - Investment Test Parameters.pdf
… states that the default value of expected unserved energy (VoLL) is equivalent to the value defined in the Electricity … and $60,000/MWh. Q13. Do you consider that our proposed VoLL of $31,500/MWh to be appropriate for valuing unserved …
USI2 - Attachment 5 - Investment Test Parameters.pdf
(PDF 553.25 KB)
Last updated: 07 Sep 2017
Battery Storage in New Zealand Appendix.pdf
… 11 A.1.7 Value of lost load (Voll) … cost of energy analysis – v 10.0 A.1.7 Value of lost load (Voll) The assumptions are based on the EA report: … Consumer Classification Consumption (GWh) per annum $ (000) Voll residential 12 non-residential (small) ≤ 0.2 57 … Profile A.1.6 Capital Cost Trends A.1.7 Value of lost load (Voll) A.2 Appendix: Heat Map Visualisation of Average …
Battery Storage in New Zealand Appendix.pdf
(PDF 1.08 MB)
Last updated: 07 Sep 2017
Battery Storage in New Zealand Appendix.pdf
… 11 A.1.7 Value of lost load (Voll) … cost of energy analysis – v 10.0 A.1.7 Value of lost load (Voll) The assumptions are based on the EA report: … Consumer Classification Consumption (GWh) per annum $ (000) Voll residential 12 non-residential (small) ≤ 0.2 57 … Profile A.1.6 Capital Cost Trends A.1.7 Value of lost load (Voll) A.2 Appendix: Heat Map Visualisation of Average …
Battery Storage in New Zealand Appendix.pdf
(PDF 1.08 MB)
Last updated: 25 May 2021
30. 01 Mar 2021 - TPM Development Checkpoint 2B submission to the Electricity Authority (BBC allocations).pdf
… unserved energy (MWh) multiplied by the value of lost load (VoLL) ($/MWh). 163.5 The regions and customer types affected … the system event. 164. All loads will have the same VoLL for a given BBI equal to the value used in the … system fault or a failure of an asset. 11.4 Rationale – one VoLL for all load customers 170. MEUG and NZ Steel disagreed …
Last updated: 27 Nov 2023
s53ZD_Customer_Consultation_CC_28November2023.pdf
… impacts were consistent with the literature (and our own VOLL survey in 2016)12 on how different customers are … power for approx. 65 minutes. 12 Refer Value of Lost Load (VoLL) study | Transpower … https://www.transpower.co.nz/resources/value-lost-load-voll-study#downloads TRANSPOWER NEW ZEALAND 16 Summary …
s53ZD_Customer_Consultation_CC_28November2023.pdf
(PDF 1.16 MB)