WUNIVM Options and Costing Report - June 2019.pdf
… supply in the WUNI region we use a Value of Lost Load (VoLL) equal to $26,500/MWh. This number is based on the … of post-fault demand shedding at specific GXPs, we use a VoLL of between $17,600 - $24,200/MWh, varying by the GXP at … these values as we consider them a better representation of VoLL at these GXPs. Our sensitivity analysis uses VoLLs of …
WUNIVM Options and Costing Report - June 2019.pdf
(PDF 1.02 MB)
Last updated: 05 Feb 2019
BRK-SFD Submission -PowerCo.pdf
… for this investigation? A: Yes 10: Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? …
BRK-SFD Submission -PowerCo.pdf
(PDF 334.58 KB)
Last updated: 20 Dec 2024
WBoP - Attachment 8 - Benefits modelling
… Benefits = Probability of event × (Unserved Energy × VoLL + Repair costs) We consider the following events and … outage, with 8 hours valued at the full Value of Lost Load (VoLL) and the remained at 20% of the value of unserved … cost: HILP event cost = Average(Demand profile ∗ Filter) × VoLL + Repair cost The risk is given by the annual expected …
WBoP - Attachment 8 - Benefits modelling.pdf
(PDF 1.87 MB)
Last updated: 15 Aug 2024
WUNIVM Short-list Consultation - June 2019.pdf
… in the WUNI region we have used a Value of Lost Load (VoLL) equal to $26,500/MWh. This number is based on the … of post-fault demand shedding at specific GXPs, we use a VoLL of between $17,600 - $24,200/MWh, varying by the GXP at … these values as we consider them a better representation of VoLL at these GXPs. • Pre-fault demand management cost of …
WUNIVM Short-list Consultation - June 2019.pdf
(PDF 1.84 MB)
Last updated: 05 Jun 2019
WUNIVM Short-list Consultation - June 2019.pdf
… in the WUNI region we have used a Value of Lost Load (VoLL) equal to $26,500/MWh. This number is based on the … of post-fault demand shedding at specific GXPs, we use a VoLL of between $17,600 - $24,200/MWh, varying by the GXP at … these values as we consider them a better representation of VoLL at these GXPs. • Pre-fault demand management cost of …
WUNIVM Short-list Consultation - June 2019.pdf
(PDF 1.84 MB)
Last updated: 17 Dec 2018
Grid Outputs Report 2018 - Technical Supplement - FINAL.pdf
… processing of Maui gas). In our analysis, it has a higher VoLL than most PoS, but a low 8 volume. It was not even … served at a PoS 9 multiplied by the Value of Lost Load (VoLL) at that PoS, and is the expected dollar cost of an … at the relationship between unplanned interruptions and: VoLL, Connection cost, Response time, Load, and VoLL x load …
Last updated: 24 May 2017
Genesis Energy submission on Service Engagement Paper 2.pdf
… potential opportunity costs/value of outages (similar to (VoLL principles applied for POS) to help guide and 3 …
Genesis Energy submission on Service Engagement Paper 2.pdf
(PDF 69.51 KB)
Last updated: 22 May 2023
System operator initial report Hawkes Bay loss of supply.pdf
… to restore service means the estimated value of lost load (VoLL) will be significant. A calculation of VOLL will be included in the final report. TRANSPOWER NEW … network TUI Tuai substation Unison Unison Networks VoLL Value of lost load WHI Whirinaki substation WRA Wairoa …
Last updated: 24 May 2017
Service Engagement Submissions.pdf
… potential opportunity costs/value of outages (similar to (VoLL principles applied for POS) to help guide and 3 … required for the new approach, such as Value of Loss Load (VoLL), while not arbitrary do have wide error bounds. Estimating and then applying VoLL is complicated by the inherent non-linearity that can …
Service Engagement Submissions.pdf
(PDF 1.06 MB)
Last updated: 20 Jul 2023
TP_Sub_IMs_Draft_Decisions_19July2023.pdf
… change effects are changing existing understanding) • VOLL estimates do not include risk aversion or societal cost in relation to a catastrophic event. In addition, the VOLL estimate is not based on long duration outages. 115. On … point, the Commission offers that we can propose our own VOLL, but the research literature52 on the VOLL for …
TP_Sub_IMs_Draft_Decisions_19July2023.pdf
(PDF 864.15 KB)