Resources
Displaying 101 - 110 of 1352
Last updated: 21 Nov 2023
Service Measures Report 2023.pdf
… Service Measures Report 2023 November 2023 Service Measures Report 2023 … 16 3.4. Linking service measures to planning … provide to our customers • the performance of our regulated transmission business during Disclosure Year 2023 (DY 2023; … 1 below). They include provision of regulated electricity transmission services, provision of the system operator …
Last updated: 04 Mar 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 04 Mar 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 30 Jan 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 14 Dec 2021
Atiamuri Project RMA Notification Decision Report.pdf
… NOTIFICATION AND DECISION REPORT FOR LAND USE CONSENT RM210390 & RM210391 PURSUANT TO … and operates New Zealand’s high voltage electricity transmission network – the National Grid – which links … Zoning The site is zoned Rural Environment as identified on Planning Map B4 of the District Plan, and shown on the map …
Last updated: 15 Jan 2019
November 2018 report.pdf
… asset capacity and grid configuration Annual Report 2017 - 2018 Pursuant to Electricity Industry … the hazards with operating large irrigation system near our transmission lines. 123 12-FEB-2018: OAM-BPT-WTK-1 tripped, … the hazards with operating large irrigation system near our transmission lines. 124 OAM-STU-BPD-WTK-2 B CCT 110 1.28 …
Last updated: 12 Dec 2024
Transpower Integrated Report FY24 final
… Integrated Report FY 2024 Optimising the transition D. 17 2024 1994 … over 100 years, our people have been the kaitiaki of the transmission lines and substations that form the National … for New Zealand OUR PURPOSE Transpower is responsible for planning, building, maintaining and operating the National …
Last updated: 28 Aug 2024
Transpower Integrated Report FY24.pdf
… Integrated Report FY 2024 Optimising the transition D. 17 2024 1994 … over 100 years, our people have been the kaitiaki of the transmission lines and substations that form the National … for New Zealand OUR PURPOSE Transpower is responsible for planning, building, maintaining and operating the National …
Last updated: 09 Sep 2025
GHD HVDC Cable Replacement IER Report
… number 12668388 File name GHD HVDC Cable Replacement IER Report.docx Status Code Revision Author Reviewer Approved … reliability and capacity for the inter-island electricity transmission system. The upgrade is triggered by the age of … (GEIP) and regulatory expectations. Procurement and Planning The HVDC Link Upgrade Programme is currently in its …
Last updated: 08 Oct 2019
Regulatory Initiatives Plan - March 2016 Update.pdf
… the RCP2 period and details a programme of asset management planning improvements, of which asset health modelling and … models will be matured in time to inform our Integrated Transmission Plan (ITP) in June 2017; and the lower priority … and traceable, and provides portfolio- wide tools and reporting. Our estimating cycle is illustrated on the …