Resources
Displaying 1001 - 1010 of 1260
Last updated: 08 Jun 2022
Market Operations - Weekly Market Movements - 5 June 2022.pdf
… Generation Balance forecast New Zealand Generation Balance report for June 2022 - The next six months The New Zealand Generation Balance (NZGB) report for June 2022, covering the next six months is now … six months. This tells us that if all the generation and transmission capacity not planned to be on outage is offered …
Last updated: 04 Oct 2023
Proposed amendments to the National Code of Practice (Utility operators’ access to transport corridors)
… of the National Grid, with 11,000 km of high voltage transmission lines, and 37,000 towers and poles, connecting … 2022, Page 5 5 Draft Utility Location Standard: Decision Report following consultation on draft standard, 1 June …
Last updated: 30 Nov 2021
POCP Help Information.pdf
… Generation Equipment owned or operated by Generators Transmission Equipment owned or operated by Transmission … Generation Generation not dispatched by the System Operator Planning status One of four outage states defined by the … • allows for relatively easy extension (in terms of fields reported etc) • allows automatic uploading • ensures …
Last updated: 13 Mar 2017
CPK-WIL B Reconductor Attachment A - Condition Assessment.pdf
… 14 2| Introduction This document is a Condition Assessment report for the Central Park – Wilton B line conductor … and Insulators Fleet Strategy (Issue 1 2013) ii TP.SS 02.17 Transmission line condition assessment, Part C: Insulators and conductors iii TP.DL 12.01 Transmission line loadings code … CPK-WIL B Reconductor …
Last updated: 07 Feb 2024
SOROP Consultation Paper - 2024 01 18 DRAFT.pdf
… 9.3.1 2. The SOROP is one of our key security of supply planning and policy documents. 3. The SOROP outlines when … for shortages of electricity supply as well as shortages of transmission capacity to manage shortage of supply … specialist). (b) any other personnel responsible for reporting to the system operator on the specified …
Last updated: 02 Dec 2020
New Generation Connections FAQ - web copy Dec 2020.pdf
… plant to start on their own and liven part of a blacked-out transmission system • Over Frequency Arming – the ability … find more information on constraints in our Transmission Planning Report. To understand the uncertainties at play when …
Last updated: 06 Dec 2022
5. ERANZ Submission to Transpower on RCP4 - Nov2022.pdf
… the electricity sector in new and upgraded generation, transmission, and distribution assets. Ultimately, these … our approach for embedding innovation and efficiency in our planning? If not, please let us know why. Yes. ERANZ … use? No further comment. Question 16: How should Transpower report on our progress on delivering resilience programmes? …
Last updated: 12 Feb 2021
13. 18 Jan 2021 - TPM Development Checkpoint 1 re-submission to the Electricity Authority (Transitional Congestion Charge).pdf
… tools, (e.g. GXP-level peak load forecasting used in its Transmission Planning Report) to assess the extent of congestion risk in the …
Last updated: 10 Mar 2025
System Operator -SOSFIP review Issues Paper - March 2025
… a dry year) and making the trigger for commencing increased reporting more deterministic.7 22. After receiving the … situation if (say) the failure of large generation or transmission assets requires a quicker decision to be made. … is it that there will be sufficient generating plant and transmission grid capacity to meet demand at any instant. …
Last updated: 15 Jun 2023
NZGP1 MCP Application Addendum .pdf
… on further longer-term issues (Stage 1); and 2. planning and carrying out larger investments (Stage 2). This … 2020. 4 The Investment test assesses which combination of transmission and generation minimises the total delivered … this MCP: 8 Note, this measure does not match our annually reported HVDC link availability. The HVDC link includes the …