Resources
Displaying 1001 - 1010 of 1295
Last updated: 14 Dec 2017
TP_Sub_Real-Time_Pricing_10Oct2017.pdf
… the Authority’s statutory objective. As stated in the report by the system operator, “the level of change is the … to apportion loss and constraint excess for financial transmission rights each month (if that is required)? If … for apportioning loss and constraint excess to financial transmission rights, but seek clarification on the process …
Last updated: 12 Jul 2022
Frontier_RAB indexation_IMsReview_11July2022.pdf
… RAB indexation Report for Transpower | 7 July 2022 2 2 RAB indexation … already been resolved for Transpower. • Recent Australian transmission project examples. 8 RAB indexation Frontier … has impacted the commercial viability of major new transmission projects. Under the Australian framework, full …
Last updated: 06 Oct 2023
20220710 Final submission on the exposure draft changes to the NPS-FM and NES-F.pdf
… owns and operates New Zealand's high voltage electricity transmission network (the National Grid). The National Grid … • ‘Operational need’, as defined in the National Planning Standards, is added to the consenting pathway for … the functional need definition.8 The Court referred to a report issued by the Ministry for the Environment on the …
Last updated: 07 Mar 2025
USI Short-list - Summary of submissions
… under increased capital costs. Additional points raised 1. Transmission charges: Westpower expressed concerns about the … summer months, requiring careful consideration in upgrade planning. • Evolving load control strategies: The shift from … if and when required. 3.1 Other points raised 1. Westpower reported significant recent increases in transmission …
Last updated: 19 Mar 2024
Market Operations - Weekly Market Movements - 17 March 2024.pdf
… the forecast period is 208 MW on 10 May. The latest NZGB report is available on the NZGB website. Electricity Market … to a spring washer effect, which arose due to constrained transmission in the lower South Island. One of two NMA_TWI … These prices were consistent with the constraints on the transmission system. They reflected the high value of …
Last updated: 13 Nov 2019
Market Summary for week ended 10 Nov 2019.pdf
… Zealand’s irrigation is located. Check out Niwas hot spot reports for details. 6. With the HVDC outage coming up in Q1 … more load in the Hawkes Bay electrical region, leading to transmission constraints on the circuits between Fernhill …
Last updated: 07 Dec 2023
Part B Grid Configuration and Operations.pdf
… ▪ land has been acquired for construction of the project ▪ planning consents, construction approvals and licences have … of the local system load, the status of all the 220 kV transmission circuits from north of Bunnythorpe to Haywards, … SSF uses the same method as the 2022 Transmission Planning Report (TPR) “expected” forecast8 prepared by Transpower, in …
Last updated: 20 Aug 2021
2021_Jun_Part B Grid Configuration and Operations.pdf
… ▪ land has been acquired for construction of the project ▪ planning consents, construction approvals and licences have … of the local system load, the status of all the 220 kV transmission circuits from north of Bunnythorpe to Haywards, … SSF uses the same method as the 2020 Transmission Planning Report (TPR) “expected” forecast8 prepared by Transpower, in …
Last updated: 10 Dec 2020
2020_Dec_Part B Grid Configuration and Operations.pdf
… ▪ land has been acquired for construction of the project ▪ planning consents, construction approvals and licences have … of the local system load, the status of all the 220 kV transmission circuits from north of Bunnythorpe to Haywards, … SSF uses the same method as the 2020 Transmission Planning Report (TPR) “expected” forecast8 prepared by Transpower, in …
Last updated: 11 Mar 2019
TWA template 2019.pdf
… AND PROJECT TIMEFRAME SCHEDULE 3: CONDITIONS SCHEDULE 4: REPORTING AND PROJECT TIMEFRAME AND BUDGET VARIATIONS … A Transpower owns and operates New Zealand’s electricity transmission system – the National Grid. B Transpower wishes … in accordance with, and to the standard required by, the Transmission Agreement and Code. 4.3 Replacement Works (a) …