Resources
Displaying 1021 - 1030 of 1234
Last updated: 16 Dec 2022
Enabling whole system reliability and efficiency with distributed flexibility - a System Operator view.pdf
… OPERATIONS // December 2022 Network companies at both transmission and distribution level, as well as retailers … below, which Transpower’s Whakamana i Te Mauri Hiko report sets out in more detail3. Value for consumers Revenue … to access DER flexibility as a non- network solution when planning network upgrades. Several distributors are also …
Last updated: 01 Oct 2024
Policy Statement 2024 consultation information_final.pdf
… 14. We plan to operate the system with constraints on transmission and generation, and other possible mitigations, … 1 https://www.transpower.co.nz/system-operator/notices-and-reporting/notices-insufficient-generation … (AUVLS) Aids in understanding the scope of the emergency planning policies 15 Current Clause Proposed Clause Summary …
Policy Statement 2024 consultation information_final.pdf
(PDF 529.83 KB)
Last updated: 25 May 2021
44. 03 May 2021 - TPM Development Checkpoint 2C submission to the Electricity Authority (Residual Charges and the Treatment of Batteries Options).pdf
… residual charge to grid-connected batteries under the new transmission pricing methodology (TPM). Background 2. An … Authority (Authority) released its final decision on its transmission pricing review and published new TPM Guidelines … batteries. ” 5. The Authority also commissioned a report from Sense Partners on electricity storage and the …
Last updated: 16 Aug 2023
NZGP1 MCP Revised Preferred Option 16 August 2023.pdf
… of work which aims to ensure New Zealand’s national transmission network can enable a low-carbon, highly … and investigations on longer-term issues (Stage 1); and 2. planning and carrying out subsequent investments (future … assumes a historical distribution of hydro sequences and reports an average hydrological impact. If a wet year …
NZGP1 MCP Revised Preferred Option 16 August 2023.pdf
(PDF 665.49 KB)
Last updated: 23 Sep 2021
2021_09_23 Temporary Shunts.pdf
… temporary shunts in service for more than 2 years must be reported to the SDM so action can be taken to replace them. … Engineering) please contact: Designation: Senior Transmission Line Engineer Ph: +64 4 590 6279 Mob: +64 27 …
2021_09_23 Temporary Shunts.pdf
(PDF 305.88 KB)
Last updated: 31 May 2022
68. NZWEA Submission on Renewable Energy Zones (REZ) - FINAL.pdf
… in renewable generation projects. 4. Internationally transmission is recognised as a key enabler of generation … From a wind energy perspective MBIE’s June 2020 Wind Stack Report has identified significant economic wind potential in … the resource management system reform and the Strategic Planning Act may assist and the Association supports …
68. NZWEA Submission on Renewable Energy Zones (REZ) - FINAL.pdf
(PDF 163.41 KB)
Last updated: 22 Feb 2022
Market Operations - Weekly Market Movements - 20 February 2022.pdf
… system links Aotearoa’s North Island and South Island transmission grids. This allows excess generation in one … again to AC at the other end. Direct current is used for transmission over long distances as there are lower losses … [email protected] Hydro data used in this report is sourced from NZX Hydro. Electricity risk curves …
Last updated: 06 Mar 2024
Examining the purpose and future role of our HVDC link - March 2024
… A discussion on the changing role of the HVDC inter-island transmission link in New Zealand, in the context of … that connects the North and South islands is part of this planning for a future shaped by electrification. As the … Investigation - Attachment B: Power System Analysis report’, Transpower, 2 December 2022. Figure 9 – Repair of a …
Last updated: 13 Jul 2017
TP Cross Sub Capex IM 28 June 2017.pdf
… and fit for purpose option selected.”1 On our publication Transmission Tomorrow, Pioneer Energy stated “we commend … on July 27th to cover revenue and pricing, innovation, our planning report, demand response, and our Auckland strategy. In this …
TP Cross Sub Capex IM 28 June 2017.pdf
(PDF 437 KB)
Last updated: 16 Dec 2022
Part F Dry Year.pdf
… transfer is 1134 MW received at Haywards. In evaluating the transmission constraints for a dry island, we have assumed … and a limit of 1134 MW received at Haywards. • Committed transmission and generation changes are incorporated as per … generation. Note that not all constraints have been reported in this section, only those which would require …
Part F Dry Year.pdf
(PDF 397.12 KB)