Resources
Displaying 1051 - 1060 of 1234
Last updated: 27 Sep 2021
20210923 - AS Tender 2021 - Standard Terms Part A1 - Glossary and Interpretation.pdf
… Department or authorised agency ceases to compile and report figures for the Consumers Price Index (all groups), … operator engaged in the co-ordination of an integrated transmission network under the same or similar circumstances …
Last updated: 13 May 2025
Simply Energy Questions for the SO 30.04.2025
… Independent Resources that operate and are assessed and reported independently from each other. When bidding via … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …
Simply Energy Questions for the SO 30.04.2025.pdf
(PDF 103.65 KB)
Last updated: 13 May 2024
HVDC Stage 1 Enhancement Project Analysis - May 2024
… to the counterfactual (i.e., where no investment in the transmission network occurs).2 Further details on our … in Table 3 of our NZGP1.1 Proposal to the Commission we reported net benefits of $66m if Tiwai’s closure was delayed … NZGP1.1 MCP Attachment D – Scenario and Modelling Report – September 2023. …
HVDC Stage 1 Enhancement Project Analysis - May 2024.pdf
(PDF 2.36 MB)
Last updated: 23 Aug 2018
Media release Transpower releases 2017 18 Annual Result.pdf
… arrangements set by the Commerce Commission to determine transmission revenues. • Operating expenses were $293.9 … the implications for Auckland.” Transpower’s full annual report will not be available until tabled in Parliament …
Media release Transpower releases 2017 18 Annual Result.pdf
(PDF 111.19 KB)
Last updated: 04 Jun 2025
MEUG - Security of Supply Assessment June 2025 - Submission
… (SoSA) and we appreciated the chance to discuss this draft report with Transpower’s Chief Executive at a recent member … the electricity sector to build the necessary generation, transmission and distribution infrastructure required to … is highlighted in the Frontier Economics upcoming final report on its review of electricity market performance. • …
MEUG - Security of Supply Assessment June 2025 - Submission.pdf
(PDF 218.51 KB)
Last updated: 20 Apr 2018
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
… revenue requirement, and is not discussed here. A separate report on the Optimised Deprival Value of Transpower’s Fixed … achieve this, Transpower must recover the sunk costs of its transmission assets. The SCI stipulates also that … year, and from year to year, facilitate effective business planning, including of new investment. From Transpower’s …
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
(PDF 286.06 KB)
Last updated: 06 Oct 2023
2019 TRANSPOWER Submission on proposed NPS for Highly Productive Land.pdf
… benefits of highly productive land being considered in planning and consenting processes? No comment. Section 3.2: … with the National Policy Statement on Electricity Transmission 2008 (the NPSET). The NPSET was developed under … Climate Change Committee’s “Electricity Inquiry – Final Report” reinforced the importance of electrification to …
Last updated: 09 Aug 2017
Busbar Classification - Recommendations from Updated Credible Event Methodology.pdf
… Website: http://www.transpower.co.nz SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION REVIEW 4 Contents 1 Executive … in this report in line with organisational priorities and planning. SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION … Loss of three Roxburgh generators Consequence: Loss of the transmission circuits during low Manapouri generation will …
Last updated: 29 Jun 2017
Busbar Classification Review.pdf
… Website: http://www.transpower.co.nz SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION REVIEW 3 Contents 1 Executive … in this report in line with organisational priorities and planning. SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION … Loss of three Roxburgh generators Consequence: Loss of the transmission circuits during low Manapouri generation will …
Busbar Classification Review.pdf
(PDF 5.34 MB)
Last updated: 25 Jan 2023
Customer ICCP Interconnection Policy
… 26 E. PRO-FORMA DATA TRANSMISSION AGREEMENT … of each of the parties, together with contact details for reporting problems. 5.3 Requests for New RTU-based SCADA … to this must be approved by the Secondary Systems AM Planning Manager. Where a direct connection is permitted the …
GC 29.01.pdf
(PDF 2.22 MB)