13. 18 Jan 2021 - TPM Development Checkpoint 1 re-submission to the Electricity Authority (Transitional Congestion Charge).pdf
… tools, (e.g. GXP-level peak load forecasting used in its Transmission Planning Report) to assess the extent of congestion risk in the …
Last updated: 06 Dec 2022
5. ERANZ Submission to Transpower on RCP4 - Nov2022.pdf
… the electricity sector in new and upgraded generation, transmission, and distribution assets. Ultimately, these … our approach for embedding innovation and efficiency in our planning? If not, please let us know why. Yes. ERANZ … use? No further comment. Question 16: How should Transpower report on our progress on delivering resilience programmes? …
Last updated: 15 Jun 2023
NZGP1 MCP Application Addendum .pdf
… on further longer-term issues (Stage 1); and 2. planning and carrying out larger investments (Stage 2). This … 2020. 4 The Investment test assesses which combination of transmission and generation minimises the total delivered … this MCP: 8 Note, this measure does not match our annually reported HVDC link availability. The HVDC link includes the …
Last updated: 04 Oct 2023
Proposed amendments to the National Code of Practice (Utility operators’ access to transport corridors)
… of the National Grid, with 11,000 km of high voltage transmission lines, and 37,000 towers and poles, connecting … 2022, Page 5 5 Draft Utility Location Standard: Decision Report following consultation on draft standard, 1 June …
Last updated: 08 Jun 2022
Market Operations - Weekly Market Movements - 5 June 2022.pdf
… Generation Balance forecast New Zealand Generation Balance report for June 2022 - The next six months The New Zealand Generation Balance (NZGB) report for June 2022, covering the next six months is now … six months. This tells us that if all the generation and transmission capacity not planned to be on outage is offered …
Last updated: 13 Mar 2017
CPK-WIL B Reconductor Attachment A - Condition Assessment.pdf
… 14 2| Introduction This document is a Condition Assessment report for the Central Park – Wilton B line conductor … and Insulators Fleet Strategy (Issue 1 2013) ii TP.SS 02.17 Transmission line condition assessment, Part C: Insulators and conductors iii TP.DL 12.01 Transmission line loadings code …
Last updated: 08 Jul 2021
Infrastructure Commission - Infrastructure for a Better Future - Transpower Response.pdf
… to reduce demand uncertainty and improve infrastructure planning? .................... 50 Question 15: What steps … As the owner and operator of New Zealand’s electricity transmission grid, an essential part of Transpower’s role is … comments are based on the content of the Randerson Panel Report, New Directions For Resource Management in New …
Last updated: 10 Mar 2025
System Operator -SOSFIP review Issues Paper - March 2025
… a dry year) and making the trigger for commencing increased reporting more deterministic.7 22. After receiving the … situation if (say) the failure of large generation or transmission assets requires a quicker decision to be made. … is it that there will be sufficient generating plant and transmission grid capacity to meet demand at any instant. …
Last updated: 18 May 2022
2022 SOSA - For Consultation.pdf
… 42 4.2.6 Inter-Island Transmission Assumptions … demand forecast aligned with transmission and strategic planning (e.g. Whakamana i Te Mauri Hiko), the Electricity … and demand, as highlighted in our Weekly Market Movements report (Market Operations - Weekly Market Movements - 28 …
Last updated: 19 Nov 2020
Contact Energy Submission on TPM First Mover Disadvantage Consultation.pdf
… We are committed to supporting this goal. Having transmission costs that are affordable, transparent and … and pricing. Simple questions on the potential quantum of transmission charges under the new TPM are all but … and imminent. In particular, Transpower’s Te Mauri Hiko report forecasts that electricity demand in New Zealand will …