Resources
Displaying 1131 - 1140 of 1234
Last updated: 13 Oct 2023
Orion submission to Transpower on USI long list consultation October 2023.pdf
… early options for upgrades on the high-voltage electricity transmission network for the Upper South Island region. Our … This strategy has been talked about more since the May 2020 report used by Transpower: Utility-Scale Solar Forecast in … they are called. That is not ideal, because it makes planning difficult, but if we were to contract on the basis …
Last updated: 10 Sep 2019
ERC Thermal Scenarios - September 2019.pdf
… with the reduced gas scenario used in the latest NZGB Report. This scenario is a conservative approach to … a major infrastructure failure – the complete loss of gas transmission to major North Island electricity generators … both the ERCs and SSTs are impacted by the loss of gas transmission in the North Island. In this scenario, the …
ERC Thermal Scenarios - September 2019.pdf
(PDF 1.78 MB)
Last updated: 26 Nov 2013
TP_Sub_Regulatory_Institutions_and_Practice_25_10_13.pdf
… in our submission to the Electricity Authority’s Transmission Pricing CB A framework consultation paper, … and the Electricity Authority vis-à-vis promoting efficient transmission investment decisions. This is not explicit but … February - June 2000 Electricity Industry Inquiry and Report. The Government announced a Ministerial Inquiry into …
TP_Sub_Regulatory_Institutions_and_Practice_25_10_13.pdf
(PDF 551.86 KB)
Last updated: 07 Aug 2024
Vector Submission Transpower Evolving Market Resource Coordination - 2024-July.pdf
… Operator must consider resources connected both at the transmission level as well as the distribution level of the … real time operations but would also greatly support network planning. • We also recommend that the Authority consider … clarity for other obligated parties as to when they should report on any planned outages (ideally this notification …
Last updated: 06 Nov 2024
Summary Notes - 2024 System Operator Asset Owner Engineering Forum.pdf
… Presentation 1 – Questions and Answers Audience: Is grid planning using connection queue as input? Or still using … depends on circuit. Will allow small reductions in through transmission but not core backbone – would need bypass … next steps. Phillip Beardmore (Strata Energy Consulting) reported on the recently completed consultation on Frequency …
Last updated: 13 Apr 2021
Vector submission on TPM Residual Charges and the Treatment of Batteries Options Consultation - attachment 1.pdf
… Transmission pricing mechanism in New Zealand: An analysis … In El Salvador the transmission company is in charge of the planning and construction of transmission projects. The … Cambridge Economic Policy Associates, OFTO Benchmarking, Report prepared for Ofgem, December 2014, pp. 1-2. 116 See …
Last updated: 01 Nov 2018
Feedback Summary - July 2018.pdf
… increased operational safety risk. We are also considering reporting on the notice period given for delays to scheduled … AP1 and AP2 are looking at minimising the effect of transmission constraints on the market. We have considered … our proposed RCP3 asset health output measures. Our asset planning decisions take into account asset criticality where …
Feedback Summary - July 2018.pdf
(PDF 421.32 KB)
Last updated: 30 Jul 2018
Feedback summary July 2018.pdf
… increased operational safety risk. We are also considering reporting on the notice period given for delays to scheduled … AP1 and AP2 are looking at minimising the effect of transmission constraints on the market. We have considered … our proposed RCP3 asset health output measures. Our asset planning decisions take into account asset criticality where …
Feedback summary July 2018.pdf
(PDF 421.32 KB)
Last updated: 22 Aug 2024
ERC_buffer_decision_22Aug2024.pdf
… 10 4.2. A wider review of the risk reporting framework is required … information to the market. As part of our increased market reporting during this time of low hydro storage, we are: • … and assumptions around potential fuel, generation and transmission availability does not indicate any significant …
ERC_buffer_decision_22Aug2024.pdf
(PDF 602.98 KB)
Last updated: 30 Jan 2025
GL-EA-959 Asset Capability Information Guideline.pdf
… of a new or modified connection: ▪ before the completion of planning for the construction (Planning ACS) ▪ at, or … New Zealand’s electricity system, along with a summary of transmission charges. ▪ GL-EA-953 Connection Study Guide for … commissioning documentation and test results. Commissioning reports should confirm prior performance assessments and the …
GL-EA-959 Asset Capability Information Guideline.pdf
(PDF 331.28 KB)