Resources
Displaying 1151 - 1160 of 1352
Last updated: 13 May 2024
HVDC Stage 1 Enhancement Project Analysis - May 2024
… to the counterfactual (i.e., where no investment in the transmission network occurs).2 Further details on our … in Table 3 of our NZGP1.1 Proposal to the Commission we reported net benefits of $66m if Tiwai’s closure was delayed … NZGP1.1 MCP Attachment D – Scenario and Modelling Report – September 2023. …
Last updated: 03 Oct 2025
APD Global - CACTIS Submission
… successful connection of complex projects to electricity transmission and distribution networks across ANZ. APD has … asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the Agree … frames for asset owners to submit a final connection study report, and for the system operator to review it? APD …
Last updated: 06 Oct 2023
2019 TRANSPOWER Submission on proposed NPS for Highly Productive Land.pdf
… benefits of highly productive land being considered in planning and consenting processes? No comment. Section 3.2: … with the National Policy Statement on Electricity Transmission 2008 (the NPSET). The NPSET was developed under … Climate Change Committee’s “Electricity Inquiry – Final Report” reinforced the importance of electrification to …
Last updated: 13 May 2025
Simply Energy Questions for the SO 30.04.2025
… Independent Resources that operate and are assessed and reported independently from each other. When bidding via … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …
Last updated: 20 Apr 2018
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
… revenue requirement, and is not discussed here. A separate report on the Optimised Deprival Value of Transpower’s Fixed … achieve this, Transpower must recover the sunk costs of its transmission assets. The SCI stipulates also that … year, and from year to year, facilitate effective business planning, including of new investment. From Transpower’s …
Last updated: 05 Dec 2025
Appendix A Grid Configuration_Minor update 2025 December
… of CML-FKN 1 & 2 circuits to 100degC to increase Frankton transmission capacity April-2026 13 INV 220/66 supply … in this SSF uses the same method as the 2023 Transmission Planning Report (TPR) “expected” forecast3 prepared by Transpower, in …
Last updated: 23 Aug 2018
Media release Transpower releases 2017 18 Annual Result.pdf
… arrangements set by the Commerce Commission to determine transmission revenues. • Operating expenses were $293.9 … the implications for Auckland.” Transpower’s full annual report will not be available until tabled in Parliament …
Last updated: 04 Jun 2025
MEUG - Security of Supply Assessment June 2025 - Submission
… (SoSA) and we appreciated the chance to discuss this draft report with Transpower’s Chief Executive at a recent member … the electricity sector to build the necessary generation, transmission and distribution infrastructure required to … is highlighted in the Frontier Economics upcoming final report on its review of electricity market performance. • …
Last updated: 07 May 2025
HVDC - Short List Consultation Main Document
… 12 3.3 Non-transmission solutions … and reliability of the HVDC submarine cables. While planning the cable replacement, we have reviewed other … of the preferred option. These costs are recovered through transmission charges. This document provides an overview of …
Last updated: 29 Sep 2020
ITP Narrative 2020 - Schedules.pdf
… Integrated Transmission Plan 2020 Schedules Transpower New Zealand Ltd … For more details refer to Chapter 4 of the Transmission Planning Report Projects Outputs Status Estimated cost (nominal) …