Resources
Displaying 1181 - 1190 of 1352
Last updated: 11 Dec 2017
Effect of Solar PV on Frequency Management in New Zealand.pdf
… power system: generation dispatch, frequency management, transmission voltage management and transient stability. Study reports have been produced for each of these areas, with … Contingency The uncertainty of an event occurring, and the planning to cover for it CVP Constraint Violation Penalty …
Last updated: 14 Jul 2016
TPR15917 Development GuideWEBFINAL.pdf
… or first-time developer, it can appear daunting planning and designing around high voltage transmission lines, so we’ve put this easy to follow guide … are rare and may indicate a problem with the line. Always report flashovers. INSULATOR Insulators (or an insulator …
Last updated: 19 Aug 2024
Evolving_Market _Resource_Coordination - Simply response 14.08.2024.pdf
… we expect to face delivering our role within the outage planning process? Please share your reasoning. Yes agree, … in the System Security Forecast (SSF) as an input into the Transmission Planning Report and the Net Zero Grid Pathways process as a …
Last updated: 21 Nov 2018
PWC_Estimating the Value of Lost Load.pdf
… of Lost Load in New Zealand We are pleased to enclose our report, Estimating the Value of Lost Load in New Zealand. … Transpower can use to effectively manage the electricity transmission network in New Zealand. Please let us know if … Island to help Transpower improve the way it manages its transmission assets.1 This current assessment builds on that …
Last updated: 21 Nov 2018
PWC_Estimating the Value of Lost Load.pdf
… of Lost Load in New Zealand We are pleased to enclose our report, Estimating the Value of Lost Load in New Zealand. … Transpower can use to effectively manage the electricity transmission network in New Zealand. Please let us know if … Island to help Transpower improve the way it manages its transmission assets.1 This current assessment builds on that …
Last updated: 19 Sep 2023
Market Operations - Weekly Market Movements - 17 September 2023.pdf
… and October coinciding with multiple generation and transmission outages. As noted above the grid owner shifted … a week out, we will advise the market. The latest NZGB report is available on the NZGB website. Despite the tight … across September and October with multiple generation and transmission outages due to faults, preventative maintenance …
Last updated: 26 Nov 2019
Folder Reference Index.pdf
… of mutual interest drawings TP.GL 00.01 Management of transmission line drawings policy RECORD OF AMENDMENTS Issue … by the Transpower System Operations - Investigation & Planning - Ops Planning Senior Commissioner and they are … details, manufacturer (stress tables, outlines, etc.), test reports, loading diagrams (includes …
Last updated: 23 Oct 2025
TP_GO_Sub_CACTIS_Consultation_29Sept2025
… asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the … frames for asset owners to submit a final connection study report, and for the system operator to review it? See … and control. This applies to asset owners, other than transmission network owners… [page 20] …
Last updated: 02 Oct 2025
Grid Owner - CACTIS Submission
… asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the … frames for asset owners to submit a final connection study report, and for the system operator to review it? See … and control. This applies to asset owners, other than transmission network owners… [page 20] …
Last updated: 06 Nov 2020
Pre-reading EDGS 2019 - consultation document.pdf
… policy and technology dimensions. The EDGS are used in our transmission investment investigations. Transpower can … in order to recover our costs. We undertake long-term planning to forecast the level of transmission services we … for the other scenarios. We have yet to do that, but would report our assumptions on December 2, for review, if we do …