Resources
Displaying 1191 - 1200 of 1408
Last updated: 03 Jun 2022
Queue Management System consultation - For publication.pdf
… new generation applications to connect to the national transmission grid. The implementation of the proposed queue … areas of the grid where there is capacity. Competition for transmission capacity from commissioned generation is … by Transpower – for example, if the delivery of a design, report or assessment is late – will not impact the …
Last updated: 17 Jul 2024
SO Industry Forum 16 July 2024.pdf
… forecast model). These have been covered in the monthly report, found on the website. … from SO: • Avoid scheduling outages (generation/transmission that constrain off generation) on days with low … or shortfalls • Avoid scheduling outages (generation/transmission that constrain off generation) over the peaks • …
Last updated: 24 Oct 2023
Winter 2023 Review.pdf
… 2023 Review October 2023 About this document 2 Purpose This report reviews the performance of the electricity system and … is a significant asset failure in the generation fleet or transmission network) and sufficient fuel available to … in different ways. Peak demand The failure of generation or transmission assets impacts the ability to meet peak demand. …
Last updated: 12 Jul 2017
Electric Shock.pdf
… Document Generated from RiskView [HCLP‐RP] HCLP ﴾Reporting﴿ 11/17/2016, 9:43:46 AM HCLP :: Contact with … in the procedure Master Control? Moderately Effective Planning Includes pre works planning and preparation … Highly Effective Worker competency Effective Working on transmission lines CPrbty%: 100 CLh: Rare ‐ Expected to …
Last updated: 04 Sep 2018
Financial statements 17 18.pdf
… Trade and other payables 12 Provisions 13 Equity 14 Segment reporting 15 Change in fair value of financial instruments … Operating revenue and deferred income GROUP 2018 2017 $M $M Transmission revenue HVAC interconnection 687.6 689.3 HVAC … 126.2 EV (rebate) charge – HVDC 16.4 25.3 Other regulated transmission 4.3 4.6 Customer investment contracts 28.0 38.9 …
Last updated: 23 Aug 2018
Financial statements 17 18.pdf
… Trade and other payables 12 Provisions 13 Equity 14 Segment reporting 15 Change in fair value of financial instruments … Operating revenue and deferred income GROUP 2018 2017 $M $M Transmission revenue HVAC interconnection 687.6 689.3 HVAC … 126.2 EV (rebate) charge – HVDC 16.4 25.3 Other regulated transmission 4.3 4.6 Customer investment contracts 28.0 38.9 …
Last updated: 22 Aug 2017
3327 Maraetai (MTI) Bus Bar Risk of Trip.pdf
… http://www.transpower.co.nz/ TRANSPOWER REPORT: Maraetai (MTI) Bus Bar Risk of Trip Event No. 3327 3 … the two generation stations at MTI and including transmission tie lines as well as the more traditional rigid … - Increased manual inspection of the bus bar. TRANSPOWER REPORT: Maraetai (MTI) Bus Bar Risk of Trip Event No. 3327 4 …
Last updated: 27 Sep 2021
20210923 - AS Tender 2021 - Standard Terms Part A1 - Glossary and Interpretation.pdf
… Department or authorised agency ceases to compile and report figures for the Consumers Price Index (all groups), … operator engaged in the co-ordination of an integrated transmission network under the same or similar circumstances …
Last updated: 06 Oct 2023
2019 TRANSPOWER Submission on proposed NPS for Highly Productive Land.pdf
… benefits of highly productive land being considered in planning and consenting processes? No comment. Section 3.2: … with the National Policy Statement on Electricity Transmission 2008 (the NPSET). The NPSET was developed under … Climate Change Committee’s “Electricity Inquiry – Final Report” reinforced the importance of electrification to …
Last updated: 13 May 2024
HVDC Stage 1 Enhancement Project Analysis - May 2024
… to the counterfactual (i.e., where no investment in the transmission network occurs).2 Further details on our … in Table 3 of our NZGP1.1 Proposal to the Commission we reported net benefits of $66m if Tiwai’s closure was delayed … NZGP1.1 MCP Attachment D – Scenario and Modelling Report – September 2023. …