Resources
Displaying 121 - 130 of 1259
Last updated: 24 Sep 2019
Asset Management Plan 2018.pdf
… 51 3.9 Contingency planning … 222 4.4 Transmission Lines … 448 5.4 Portfolio Plan - Transmission Systems … 41 Figure 15: Asset Planning Decision Framework … is discussed within the 2018 Transmission Planning Report. All data in figures and tables are as at 30 June … assets, and the health of our assets. Our 2018 Grid Outputs Report provides more detail about our service framework and …
Last updated: 20 Dec 2023
Murihiku Southland Electrification Development Plan December 2023
… generation and electricity load growth Southland is planning for, now and into the future. Transpower New … Southland region can support this increasing demand. This report, which identifies the investment requirements in … on final tower foundation scope) • Need: Increase transmission network capacity to avoid constraints as new …
Last updated: 20 Dec 2023
Murihiku Southland Electrification Development Plan December 2023
… generation and electricity load growth Southland is planning for, now and into the future. Transpower New … Southland region can support this increasing demand. This report, which identifies the investment requirements in … on final tower foundation scope) • Need: Increase transmission network capacity to avoid constraints as new …
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Last updated: 05 Jan 2018
Asset Management Plan 2017_01.pdf
… of three supporting documents within our 2017 Integrated Transmission Plan (ITP), as illustrated in Figure 1. Figure … that has gone into refreshing and renewing our strategy, planning, and delivery functions. It incorporates our … is discussed within the 2017 Transmission Planning Report. All data in figures and tables is at 30 June 2017, …
Last updated: 05 Jul 2024
System operator preliminary report - Northland loss of supply v1.pdf
… System operator preliminary report: Northland loss of supply This document outlines the … potential overloading of the Henderson_Maungatapere 110 kV transmission circuits. A grid emergency was declared at … (T130 on the Henderson-Marsden A double circuit 220 kV transmission line), auto-reclose was unsuccessful in … 15 Appendix B: Pre-event planning timeline …
Last updated: 06 Jun 2018
Interconnection Asset Capacity and Grid Configuration Reports - November 2017.pdf
… asset capacity and grid configuration Annual Report 2016 - 2017 Pursuant to Electricity Industry … to publish and provide a written report to each designated transmission customer and to the Board on its compliance … policy TP GQ 45.01, which Transpower uses for outage planning purposes, reflects the requirements of the Outage …
Last updated: 17 Dec 2018
Grid Outputs Report 2018 - Technical Supplement - FINAL.pdf
… 44 6 APPENDIX B—CIGRE REPORTS (AP1) … 2018 describes the grid output measures for our regulated transmission business. It provides the final refresh of our … future of energy and electricity, to help guide long-term planning. 4 This is also an area for further development …