Resources
Displaying 1201 - 1210 of 1408
Last updated: 03 Oct 2025
APD Global - CACTIS Submission
… successful connection of complex projects to electricity transmission and distribution networks across ANZ. APD has … asset owners to submit asset capability statements at the planning, pre- commissioning, and final stages of the Agree … frames for asset owners to submit a final connection study report, and for the system operator to review it? APD …
Last updated: 05 Dec 2025
Appendix A Grid Configuration_Minor update 2025 December
… of CML-FKN 1 & 2 circuits to 100degC to increase Frankton transmission capacity April-2026 13 INV 220/66 supply … in this SSF uses the same method as the 2023 Transmission Planning Report (TPR) “expected” forecast3 prepared by Transpower, in …
Last updated: 13 May 2025
Simply Energy Questions for the SO 30.04.2025
… Independent Resources that operate and are assessed and reported independently from each other. When bidding via … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …
Last updated: 14 May 2026
Draft Policy Statement 2026 Consultation Document
… 9 3.2 Security Policy - Emergency Planning … 13 3.4.1 Process to request data from transmission connected load asset owners … Capability Information 3.4.1 Process to request data from transmission connected load asset owners 53. Large loads on … New Zealand Generation Balance (NZGB) is a capacity margin reporting tool that looks 200 days ahead. It is used, by the …
Last updated: 20 Apr 2018
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
… revenue requirement, and is not discussed here. A separate report on the Optimised Deprival Value of Transpower’s Fixed … achieve this, Transpower must recover the sunk costs of its transmission assets. The SCI stipulates also that … year, and from year to year, facilitate effective business planning, including of new investment. From Transpower’s …
Last updated: 23 Aug 2018
Media release Transpower releases 2017 18 Annual Result.pdf
… arrangements set by the Commerce Commission to determine transmission revenues. • Operating expenses were $293.9 … the implications for Auckland.” Transpower’s full annual report will not be available until tabled in Parliament …
Last updated: 04 Jun 2025
MEUG - Security of Supply Assessment June 2025 - Submission
… (SoSA) and we appreciated the chance to discuss this draft report with Transpower’s Chief Executive at a recent member … the electricity sector to build the necessary generation, transmission and distribution infrastructure required to … is highlighted in the Frontier Economics upcoming final report on its review of electricity market performance. • …
Last updated: 07 May 2025
HVDC - Short List Consultation Main Document
… 12 3.3 Non-transmission solutions … and reliability of the HVDC submarine cables. While planning the cable replacement, we have reviewed other … of the preferred option. These costs are recovered through transmission charges. This document provides an overview of …
Last updated: 29 Sep 2020
ITP Narrative 2020 - Schedules.pdf
… Integrated Transmission Plan 2020 Schedules Transpower New Zealand Ltd … For more details refer to Chapter 4 of the Transmission Planning Report Projects Outputs Status Estimated cost (nominal) …
Last updated: 25 Jan 2023
Customer ICCP Interconnection Policy
… 26 E. PRO-FORMA DATA TRANSMISSION AGREEMENT … of each of the parties, together with contact details for reporting problems. 5.3 Requests for New RTU-based SCADA … to this must be approved by the Secondary Systems AM Planning Manager. Where a direct connection is permitted the …